HTR-PM
Chinese small modular nuclear reactor / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about HTR-PM?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
The HTR-PM (Chinese: 球床模块式高温气冷堆核电站) is a Chinese small modular nuclear reactor. It is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor evolved from the HTR-10 prototype. The technology is intended to replace coal-fired power plants in China's interior, in line with the country's plan to reach carbon neutrality by 2060.[1]
Quick Facts Country, Location ...
HTR-PM demonstration plant | |
---|---|
Country | People's Republic of China |
Location | Shidao Bay Nuclear Power Plant, Rongcheng, Weihai, Shandong |
Coordinates | 36°58′20″N 122°31′44″E |
Status | Operational |
Construction began | 9 December 2012 (2012-12-09) |
Commission date | 20 December 2021 |
Nuclear power station | |
Reactor type | pebble-bed reactor HTGR |
Power generation | |
Nameplate capacity |
|
Close
The first plant, the world's first for this type of reactor, has an electrical output of 210 MW. It began producing power in December 2021 and started commercial operation in late 2023.