January 2019. The Santa Clara Valley Transportation Authority (VTA) built the Berryessa Extension and intends to build the final downtown San Jose extension
Transit (BART), the Orange Line of the VTA light rail system, VTA buses, and AC Transit buses. The elevated Montague light rail station opened in June 2004
this spring". Gary, Jesse (June 12, 2020). "BART service to Milpitas and Berryessa stations starts Saturday". KTVU Fox 2. Retrieved June 12, 2020. Official
two sides by the Montague Expressway and Capitol Ave. A pedestrian bridge runs over Capitol Ave and connects the BART station with VTA's Milpitas light