Charing Cross railway station
Central London railway terminus / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about London Charing Cross railway station?
Summarize this article for a 10 year old
Charing Cross railway station (also known as London Charing Cross)[4] is a central London railway terminus between the Strand and Hungerford Bridge in the City of Westminster. It is the terminus of the Southeastern Main Lines to Dover via Ashford and Hastings via Tunbridge Wells. All trains are operated by Southeastern, which provides the majority of commuter and regional services to south-east London and Kent. It is connected to Charing Cross Underground station and is near to Embankment Underground station and Embankment Pier.
Charing Cross | |
---|---|
London Charing Cross | |
Location | Charing Cross |
Local authority | City of Westminster |
Managed by | Network Rail |
Station code | CHX |
DfT category | A |
Number of platforms | 6 |
Accessible | Yes[1] |
Fare zone | 1 |
OSI | Charing Cross Underground station Embankment Embankment Pier [2] |
Cycle parking | No |
Toilet facilities | Yes |
National Rail annual entry and exit | |
2018–19 | 30.236 million[3] |
– interchange | 0.578 million[3] |
2019–20 | 29.138 million[3] |
– interchange | 0.559 million[3] |
2020–21 | 5.373 million[3] |
– interchange | 91,995[3] |
2021–22 | 15.733 million[3] |
– interchange | 0.295 million[3] |
2022–23 | 16.191 million[3] |
– interchange | 0.419 million[3] |
Railway companies | |
Original company | South Eastern Railway |
Pre-grouping | South Eastern & Chatham Railway |
Post-grouping | Southern Railway |
Key dates | |
11 January 1864 (11 January 1864) | Opened |
Other information | |
External links | |
WGS84 | 51.508°N 0.125°W / 51.508; -0.125 |
London transport portal |
The station was originally opened by the South Eastern Railway in 1864. It takes its name from its proximity to the road junction Charing Cross, the notional "centre of London" from which distances from the city are measured. During the 19th century the station became the main London terminus for continental traffic via boat trains, and served several prestigious international services. It was badly damaged by a roof collapse in 1905 and extensively rebuilt, subsequently becoming an important meeting point for military and government traffic during World War I. By this time, Charing Cross station was seen as out of date by some politicians and proposals were made to replace Hungerford Bridge with a road bridge or road/rail combination, with the station moving to the south bank of the River Thames in the case of a road-only replacement. The station was bombed several times during World War II, and was rebuilt afterwards, re-opening in 1951. In the late 1980s, the station complex was redesigned by Terry Farrell and rebuilt to accommodate a modern office block, now known as Embankment Place.
Charing Cross station is located at the western end of the Strand in the City of Westminster, east of Trafalgar Square and northeast of Whitehall. It is close to the Embankment Pier, providing river services along the River Thames. The railway leads directly out onto Hungerford Bridge and across the river towards the London Borough of Lambeth.[5]
The station code is CHX.[4] It is one of twenty stations in Great Britain that are managed by Network Rail[6] and is the 15th busiest station in the country. A number of key bus routes run in the area, and are designated "Trafalgar Square for Charing Cross".[7]
The station was planned as the London terminus of the South Eastern Railway (SER). They had wanted to extend the line from Bricklayers Arms towards Hungerford Bridge, but a bill presented in 1846 was unsuccessful. In 1857, they proposed to Parliament that they would build a railway terminus in the West End, hoping to use Victoria, before reaching an agreement with the London, Brighton & South Coast Railway to build a line west from London Bridge.[8]
Later in the year, the SER secretary Samuel Smiles looked for potential routes and decided the best location would be on the site of the former Hungerford Market adjacent to The Strand, and that the line should be directly connected to Waterloo, allowing a link with London and South Western Railway services.[8] The Charing Cross Railway Company was formed in 1859 in order to build the extension, and the SER paid £300,000 (now £32,000,000) in capital to help build this.[9] The line towards Charing Cross was expensive to build as it traversed a heavily built-up area, which was exacerbated in 1862 when the company chose to upgrade the two running lines to three, and doubled the capacity over the bridge to four tracks.[10] The bridge replaced the original suspension bridge designed by Isambard Kingdom Brunel which opened in 1845.[lower-alpha 1] Work began in June 1860 and took around three years. The old suspension bridge remained open until the new bridge was suitable to carry foot traffic.[11] A trial run over the new line took place on 1 December 1863.[12]
The station was designed by Sir John Hawkshaw, and featured a single span wrought iron roof, 510 feet (155 m) long and 164 feet (50 m) wide, arching over the six platforms on its relatively cramped site.[9] It was built on a brick arched viaduct, the level of the rails above the ground varying up to 30 feet (9 m). The space underneath the line was used as wine cellars.[11] The roof above the tracks is a single 164-foot (50 m) wide great arch, rising to 102 feet (31 m) at its highest point.[13] The station was built by Lucas Brothers.[14]
Charing Cross station opened on 11 January 1864. The Charing Cross Railway was absorbed into the SER on 1 September, shortly after the station opened.[9][15]
The Charing Cross Hotel, designed by Edward Middleton Barry, and built by Lucas Brothers,[16] opened on 15 May 1865 and gave the station an ornate frontage in the French Renaissance style. It had 250 bedrooms spread over seven floors and extended along Villiers Street as well as the front of the Strand. The public rooms had balconies overlooking the main station concourse. It quickly became popular and was profitable, leading to a 90-bedroom annexe on the other side of Villiers Street opening in 1878. A bridge over the street connected the two parts of the hotel together.[17]
In 1887, Hungerford Bridge was widened to 48 feet 9 inches (14.86 m) in order to provide three more tracks into the station.[18] On 1 January 1899, the SER merged with the London, Chatham & Dover Railway to form the South Eastern & Chatham Railway (SECR), which took over operations at Charing Cross.[19]
Eleanor Cross
Contemporary with the Charing Cross Hotel was a replica of the Eleanor Cross in Red Mansfield stone, also designed by Edward Middleton Barry, that was erected in the station forecourt. It was based on the original Whitehall Cross built in 1291, that had been demolished in 1647 by order of Parliament.[20] Distances in London are officially measured from the original site of the cross, now the statue of Charles I facing Whitehall, and not from this replica.[21]
The cross deteriorated over time until it was in such a vulnerable condition that it was placed on English Heritage's "Heritage At Risk Register" in 2008. A ten-month project to repair and restore the cross was completed in August 2010. This work included recreating and attaching almost 100 missing ornamental features including heraldic shields, an angel, pinnacles, crockets and finials; securing weak or fractured masonry with stainless steel pins and rods and re-attaching decorative items which had previously been removed after becoming loose.[22]
International services
After opening, Charing Cross became the main terminus of all SER services instead of London Bridge, including boat trains to Continental Europe. Along with Victoria, it became the main departure point from London to abroad, and was called "the Gates of the World" by Percy Fitzgerald. Thomas Cook established a travel office on the corner of the station forecourt. The SER route became the shortest from London to Dover after a diversion at Sevenoaks was built in 1868, and by 1913 it was possible to travel from Charing Cross to Paris in six and a half hours.[23]
Owing to its international connections, Charing Cross played an important part in World War I as the main departure point for both the military and government towards the Western Front. All civilian and public boat services were suspended on 3 August 1914. Return journeys from Dover carried the sick and wounded towards Charing Cross and hence to hospitals around the country. Over the course of the war, 283 journeys departed from the station. On 26 December 1918, shortly after the war, the US President Woodrow Wilson met King George V at Charing Cross. Commercial cross-Channel services resumed to Ostend on 18 January 1919, Boulogne on 3 February and Calais on 8 January 1920, but by this time, Victoria had been expanded to accommodate the strict wartime immigration and customs checks, and Charing Cross ceased to be important as an international terminal.[24]
1905 roof collapse
A 70-foot (21 m) length of the original roof structure, comprising the two end bays at the south of the station, and part of the western wall collapsed at 3:57 p.m. on 5 December 1905. A gang of men were employed at the time in repairing, glazing and painting the section of roof which fell. Shortly after 3:45 p.m, the roof emitted a loud noise, which was when someone noticed that one of the main tie rods had broken and was hanging down. Part of the roof began to sag and the western wall began to crack.[25][26]
It was another 12 minutes before the collapse occurred, which enabled trains and platforms to be evacuated and incoming trains to be held back. The roof, girders and debris fell across four passenger trains, blocking all tracks. The part of the western wall that fell had crashed through the wall and roof of the neighbouring Royal Avenue Theatre (now the Playhouse Theatre) in Northumberland Avenue, which was being reconstructed at the time.[25] Six people died (two workmen on the roof, a W.H. Smith bookstall vendor and three workmen on the Royal Avenue Theatre site).[27]
At the Board Of Trade Inquiry into the accident, expert witnesses expressed doubts about the design of the roof, even though the cause of the failure was attributed to a faulty weld in a tie rod. Though the SECR believed the roof had a lifespan of at least forty more years, they decided not to repair it but to replace it entirely. A travelling timber gantry had to be constructed to take the remainder of the station roof down safely. The replacement was a utilitarian post and girder structure supporting a ridge and furrow roof. The curve of the original roof design can still be seen on the interior brickwork. The station was partially re-opened on 19 March 1906.[28]
The old booking offices were demolished and the various rooms on the ground floor were rearranged. A new 58-by-22-foot (17.7 m × 6.7 m) booking hall was constructed, along with a separate ladies' waiting-room. The additional remedial work was completed in 1913.[29]
Proposed closure and relocation
By the late-19th century, Charing Cross was seen as being inconveniently placed. In 1889, the newly formed London County Council's John Burns proposed that the station and its approach should be demolished, with a road bridge put in place. The idea gained support within the council as it would allow the Strand to be widened and put a road crossing over the Thames that could bypass Whitehall. When the SECR went to Parliament asking for an act to strengthen the bridge in 1916, Burns suggested the station was in the wrong place and should be rebuilt on the south side of the Thames.[30] The following year, an act was passed to reconstruct the bridge, with strict conditions about its appearance and a ban on enlarging the station building itself.[31]
Ownership of Charing Cross passed to the Southern Railway (SR) in 1923 following the Big Four grouping. The line was electrified in 1926 to cater for suburban services. The lighter load of multiple-unit electric trains was found to put far less strain on the bridge, and so traffic was redesigned so that local services ran on the older section, with mainline services using the 1887 extension.[32]
In 1926, the Royal Commission on Cross River Traffic proposed that Hungerford Bridge should be replaced by a double deck road / rail bridge, and a new Charing Cross station built to the east of the old one. The SR approved the idea as it would allow them to expand the station.[31] Two years later, a proposal appeared again to build just a road bridge and relocate the station south of the Thames, as it was significantly cheaper. The Prime Minister Stanley Baldwin urged the SR to accept the proposal, as "a matter of national importance", but the bill failed in 1930 after the select committee did not accept building a new Charing Cross on the south bank.[33] The proposal was formally rejected in 1936 by the London & Home Counties Traffic Advisory Committee, which revived the double-deck bridge option. The plans were all abandoned following the outbreak of World War II.[34]
World War II
Charing Cross sustained substantial damage in air-raids during the war. On 8 October 1940, a train was hit during a daylight raid on Whitehall. On the evening of 16/17 April 1941, the hotel was damaged by fire and explosives, four trains caught fire and there were several fires on the bridge. A 28 long hundredweight (3,100 lb; 1,400 kg) parachute mine landed next to platform 4. The station was closed to repair the damage and defuse the mine. A further raid took place on the night of 10/11 May, leading to the station's closure again. On 18 June 1944, a bomb took out a span of the bridge. Normal operation did not resume until 4 December.[35]
Following the war, the hotel received extensive repairs in 1951. This consisted of a whole new set of top floors, while the mansard roof of the upper floors of the hotel was rebuilt in a plain neo-Georgian white brick.[35]
Modernisation
The booking hall and ticket offices were modernised in 1974. Electronic ticket printing was first trialled at the station in 1983.[36]
In 1986, redevelopment began over most of the area above the platforms. The new buildings were named Embankment Place, a postmodern office and shopping complex designed by Terry Farrell and Partners. This development led to the replacement of almost the whole of the 1906 roof.[13] The rear two spans of this structure – immediately adjacent to the existing concourse roof – were retained as part of an enlarged waiting area. In addition the original retaining side walls of the station which once supported it remain in near complete condition. The works were completed in November 1990. Most of the Embankment Place complex is office space, with a selection of restaurants on the ground floor.[37][38][39]