This is a list of all stations of the Mumbai Metro, a rapid transit system serving Mumbai in the Mumbai Metropolitan Region of India. The Mumbai Metro is the Fifth transit system to be built in India. The first line of the Mumbai Metro was opened on 8 June 2014 with the Blue Line 1, with the current total number of 53 stations operating as of November 2024[1]

Thumb
Topological map of Mumbai's public transport system

Currently, the expansion of the Mumbai Metro network is going to be around 200 km (120 mi). This expansion will allow Mumbai to connect with its satellite cities that lay in the Mumbai Metropolitan Region.[2][3][4]

Each line of the Mumbai Metro is identified by a specific color. The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.[5]

Metro stations

Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Mumbai Suburban Railway and Mumbai Monorail
** Transfer station to other lines and Mumbai Suburban Railway and Mumbai Monorail
#* Terminal and transfer station to Mumbai Suburban Railway, Mumbai Monorail and Indian Railways
†¤ Terminal, transfer station to other lines, Mumbai Suburban Railway, Mumbai Monorail and Indian Railways

This list is sortable. Click on the icon in the column header to change sort key and sort order

More information Sr. No., Station name ...
Sr. No. Station name Line Layout Platform Layout Status Notes Refs
English Marathi
1 Aarey JVLR आरे कॉलनी Line 3 At-grade Side Operational from 5 October 2024 [6][7]
[8]
2 Acharya Atrey Chowk आचार्य अत्रे चौक Line 3 Underground Island Under construction Also known as Worli Naka metro station [9]
3 Airport Road विमानतळ रस्ता Line 1 Elevated Side Operational from
8 June 2014
[10]
4 Andheri†† अंधेरी Line 1 Elevated Side Operational from
8 June 2014
Transfer station for Andheri railway station [11]
5 Asalpha असल्फा Line 1 Elevated Side Operational from
8 June 2014
[12]
6 Azad Nagar आझाद नगर Line 1 Elevated Side Operational from
8 June 2014
[13]
7 Aarey आरे Line 7 Elevated Side Operational from
2 April 2022
[14]
8 Adarsh Nagar* आदर्श नगर Line 6 Elevated Side Under construction Interchange with Yellow Line 2 on Shastri Nagar metro station [15]
9 Airport Colony विमानतळ कॉलनी Line 7 Elevated Side Under construction [16]
10 Amar Mahal Junction अमर महाल जंक्शन Line 4 Elevated Side Under construction [17]
11 Amar Palace (Miragaon)* अमर पॅलेस (मिरागाव) Line 9 Elevated Side Under construction Interchange with Green Line 10 and Purple Line 13 on Shivaji Chowk (Mira Road) [18]
12 Anand Nagar (Dahisar) आनंद नगर (दहिसर) Line 2 Elevated Side Operational from
2 April 2022
Also known as Upper Dahisar metro station [19]
13 Andheri (East)* अंधेरी (पूर्व) Line 7 Elevated Side Operational from 19 January 2023 Also known as Gundavali metro station with Interchanging at Blue Line 1 on Western Express Highway [20][21]
[22][23]
14 Anik Nagar Bus Depot आणिक नगर बस डेपो Line 4 Elevated Side Under construction [24]
15 Anjur Phata अंजूर फाटा Line 5 Elevated Side Under construction [25]
16 Badhwar Park बधवार पार्क Line 3 Underground Island Under construction [26]
17 Bale बाळे Line 12 Elevated Side Under construction
18 Balkum Naka बाळकुम नाका Line 5 Elevated Side Under construction [27]
19 Bandongri बाणडोंगरी Line 7 Elevated Side Operational from
2 April 2022
Also known as Akurli metro station [28][29]
20 Bandra†† वांद्रे Line 2 Elevated Side Under construction Transfer station for Bandra railway station [30][31]
21 Bangur Nagar (Goregaon) बांगुर नगर (गोरेगाव) Line 2 Elevated Side Operational from 19 January 2023 Also known as Pahadi Goregaon metro station [32]
22 Bhakti Park (Wadala)#* भक्ती पार्क (वडाळा) Line 4
Line 11
Elevated Side Under construction Interchange with Bhakti Park monorail station on Line 1 (Mumbai Monorail) [33]
23 Bhandup Mahapalika भांडुप महापालिका Line 4 Elevated Side Under construction [34]
24 Bhandup†† भांडुप Line 4 Elevated Side Under construction Transfer station to Bhandup railway station [35]
25 Bhiwandi भिवंडी Line 5 Elevated Side Under construction [36]
26 Borivali Omkareshwar (National Park) बोरीवली ओंकारेश्वर (राष्ट्रीय उद्यान) Line 7 Elevated Side Operational from
2 April 2022
Also known as Rashtriya Udyan metro station [37]
27 BPT Hospital बी.पी.टी. रुग्णालय Line 11 Elevated Side Under construction
28 BSNL, Govandi बीएसएनएल, गोवंडी Line 2 Elevated Side Under construction [38]
29 Cadbury Junction कॅडबरी जंक्शन Line 4 Elevated Side Under construction [39]
30 Carnac Bunder कर्नाक बंदर Line 11 Underground Island Under construction
31 Chakala (J B Nagar) चकाला (जे.बी. नगर) Line 1 Elevated Side Operational from
8 June 2014
[40]
32 Charkop चारकोप Line 2 Elevated Side Operational from 19 January 2023 Also called as Valnai metro station [41]
33 Chembur†† चेंबूर Line 2 Elevated Side Under construction Interchange with VNP and RC Marg Junction monorail station on Line 1 (Mumbai Monorail) [42]
34 Chhatrapati Shivaji Maharaj Terminus†¤ छत्रपती शिवाजी महाराज टर्मिनस Line 3
Line 11
Underground Side and Island Under construction Transfer station for Chhatrapati Shivaji Maharaj Terminus [43][44]
35 Churchgate†† चर्चगेट Line 3 Underground Island Under construction Transfer station to Churchgate railway station [45]
36 Clock Tower घड्याळ टॉवर Line 11 Underground Island Under construction
37 Coal Bunder कोळसा बंदर Line 11 Underground Island Under construction
38 CSMIA T1 छ.शि.म.आं.वि. ट-१ Line 3 Underground Island Operational from 5 October 2024 [46]
39 CSMIA T2†* छ.शि.म.आं.वि. ट-२ Line 3
Line 7
Line 8[lower-alpha 1]
Underground Side and Island Operational from 5 October 2024 [47]
40 Cuffe Parade कफ परेड Line 3 Underground Island Under construction [48]
41 D.N. Nagar* डी.एन. नगर Line 1
Line 2
Elevated Side Operational from
8 June 2014
[49]
42 Dadar दादर Line 3 Underground Island Under construction [50]
43 Dahisar East†* दहिसर (पूर्व) Line 9
Line 7
Line 2
Elevated Side and Island Operational from
2 April 2022
[51]
44 Darukhana दारूखाना Line 11 Underground Island Under construction
45 Deepak Hospital (Medtiya Nagar) दीपक हॉस्पिटल (मेडतिया नगर) Line 9 Elevated Side and Island Under construction Also known as Golden Nest metro station [52]
46 Dhamankar Naka धामणकर नाका Line 5 Elevated Side Under construction [53]
47 Dharavi धारावी Line 3 Underground Island Under construction [54]
48 Diamond Garden डायमंड गार्डन Line 2 Elevated Side Under construction [55]
49 Dombivali MIDC डोंबिवली एमआयडीसी Line 12 Elevated Side Under construction
50 Don Bosco (Borivali) डाॅन बॉस्को (बोरीवली) Line 2 Elevated Side Operational from
2 April 2022
Also known as Borivali West metro station [56][57]
51 Hiranandani Estate (Dongripada) हिरानंदानी इस्टेट (डोंगरीपाडा) Line 4 Elevated Side Under construction [58]
52 Durgadi Fort दुर्गाडी किल्ला Line 5 Elevated Side Under construction [59]
53 Eastern Express Highway पूर्व द्रुतगती महामार्ग Line 2 Elevated Side Under construction [60]
54 Shimpoli शिंपोली Line 2 Elevated Side Operational from
2 April 2022
Also known as Pahadi Eksar metro station [61]
55 Ekta Nagar एकता नगर Line 2 Elevated Side Operational from
2 April 2022
Also known as Mahavir Nagar Kandivali (West) metro station [62][63]
[64]
56 ESIC Nagar ईएसआयसी नगर Line 2 Elevated Side Under construction [65]
57 Gaimukh गायमुख Line 4
Line 10
Elevated Side Under construction [66]
58 Gaimukh Reti Bandar गायमुख रेतीबंदर Line 10 Elevated Side Under construction [67]
59 Gandhi Nagar (Kanjurmarg)** गांधी नगर (कांजुर मार्ग) Line 4 Elevated Side Under construction Interchange station with Kanjurmarg railway station and Kanjurmarg (West) metro station on Pink Line 6 [68]
60 Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Line 12 Elevated Side Under construction
61 Ganesh Nagar गणेश नगर Line 11 Elevated Side Under construction
62 Garodia Nagar गरोडिया नगर Line 4 Elevated Side Under construction [69]
63 Ghatkopar#* घाटकोपर Line 1 Elevated Island Operational from
8 June 2014
Transfer station for Ghatkopar railway station [70]
64 Girgaon गिरगाव Line 3 Underground Island Under construction [71][72]
65 Godrej Company गोदरेज कंपनी Line 4 Elevated Side Under construction [73]
66 Golavali गोळवली Line 12 Elevated Side Under construction
67 Gopal Nagar गोपाळ नगर Line 5 Elevated Side Under construction [74]
68 Govegaon MIDC गोवेगाव एमआयडीसी Line 5 Elevated Side Under construction [75]
69 Gowniwada गोवनीवाडा Line 4 Elevated Side Under construction [76]
70 Grant Road†† ग्रँट रोड Line 3 Underground Island Under construction Transfer station to Grant Road railway station [77][78]
71 Hay Bunder हे बंदर Line 11 Underground Island Under construction
72 Hedutane हेदुटणे Line 12 Elevated Side Under construction
73 Hutatma Chowk हुतात्मा चौक Line 3 Underground Island Under construction [79]
74 I.C. Colony आय.सी. कॉलनी Line 2 Elevated Side Operational from
2 April 2022
Also known as Mandapeshwar metro station [80]
75 IIT Powai आयआयटी पवई Line 6 Elevated Side Under construction [81]
76 ILFS, BKC आयएलएफएस, बीकेसी Line 2 Elevated Side Under construction [82]
77 Income Tax Office (BKC)* आयकर कार्यालय (बी. के. सी.) Line 2
Line 3
Elevated; Underground Side and Island Under construction; Operational from 5 October 2024 [83][84]
78 Indira Nagar (Vile Parle) इंदिरा नगर (विलेपार्ले) Line 2 Elevated Side Under construction [85]
79 Indralok इंद्रलोक Line 9 Elevated Side Under construction [86]
80 Jagruti Nagar जागृती नगर Line 1 Elevated Side Operational from
8 June 2014
[87]
81 Jogeshwari (West)†† जोगेश्वरी (पश्चिम) Line 6 Elevated Side Under construction Transfer station to Jogeshwari railway station [88]
82 JVLR Junction* जेवीएलआर जंक्शन Line 6
Line 7
Elevated Side Under construction Also known as Jogeshwari-Vikhroli Link Road Junction metro station [89][90]
[91]
83 Kalbadevi काळबादेवी Line 3 Underground Island Under construction [92]
84 Kalher काल्हेर Line 5 Elevated Side Under construction [93][94]
85 Kalyan APMC कल्याण एपीएमसी Line 5
Line 12
Elevated Side Under construction [95]
86 Kalyan Railway Station†† कल्याण रेल्वे स्थानक Line 5 Elevated Side Under construction Transfer station to Kalyan Junction railway station [96]
87 Kandivali कांदिवली Line 2 Elevated Side Operational from
2 April 2022
Also known as Dahanukarwadi (Kandivali) metro station [97]
88 Kanjurmarg (West)** कांजुर मार्ग (पश्चिम) Line 6 Elevated Side Under construction Interchange station with Kanjur Marg railway station and Gandhi Nagar (Kanjurmarg) metro station on Green Line 4 [98][99]
89 Kapurbawdi†* कापूरबावडी Line 4
Line 5
Elevated Side Under construction [100]
90 Kasarvadavali कासारवडवली Line 4 Elevated Side Under construction [101]
91 Kasheli कशेळी Line 5 Elevated Side Under construction [102]
92 Kashimira काशिमिरा Line 10 Elevated Side Under construction Also known as Kashigaon metro station
93 Kastur Park (Shimpoli) कस्तुर पार्क (शिंपोली) Line 2 Elevated Side Operational from
2 April 2022
Also known as Shimpawali metro station [103]
94 Kasturi Park (Malad) कस्तुरी पार्क (मालाड) Line 2 Elevated Side Operational from 19 January 2023 Also known as Inorbit Mall (Malad) metro station or Lower Malad metro station [104]
95 Khira Nagar†† खिरा नगर Line 2 Elevated Side Under construction Transfer station to Santacruz railway station [105]
96 Kolegaon कोळेगाव Line 12 Elevated Side Under construction
97 Kongaon कोनगाव Line 5 Elevated Side Under construction [106]
98 Kurar Village कुरार गाव Line 7 Elevated Side Operational from
2 April 2022
Also known as Pushpa park metro station [107]
99 Kurla (East)†† कुर्ला (पूर्व) Line 2 Elevated Side Under construction Transfer station to Kurla railway station and Lokmanya Tilak Terminus [108]
100 Laxmi Nagar (Ghatkopar) लक्ष्मी नगर (घाटकोपर) Line 4 Elevated Side Under construction [109]
101 Magathane Bus Depot (Borivali) मागाठाणे बस आगार (बोरीवली) Line 7 Elevated Side Operational from
2 April 2022
[110]
102 Mahakali Caves महाकाली लेणी Line 6 Elevated Side Under construction [111]
103 Mahalaxmi†† महालक्ष्मी Line 3 Underground Island Under construction Transfer station to Mahalaxmi railway station and Sant Gadge Maharaj Chowk monorail station on Line 1 (Mumbai Monorail) [112]
104 Mahanand (Goregaon East) महानंद (गोरेगाव पूर्व) Line 7 Elevated Side Under construction [113][114]
[115]
105 Mahapalika Marg महापालिका मार्ग Line 4 Elevated Side Under construction [116]
106 Poisar पोईसर Line 7 Elevated Side Operational from
2 April 2022
[117][118]
107 Majiwada माजिवडा Line 4 Elevated Side Under construction [119][120]
108 Malad मालाड Line 2 Elevated Side Operational from 19 January 2023 Also called as Malad (West) metro station [121]
109 Mandala मंडळा Line 2 Elevated Side Under construction [122]
110 Mankhurd†† मानखुर्द Line 2 Elevated Side Under construction Transfer station to Mankhurd railway station [123]
111 Manpada (Dombivali East) मानपाडा (डोंबिवली पूर्व) Line 12 Elevated Side Under construction
112 Manpada (Thane) मानपाडा (ठाणे) Line 4 Elevated Side Under construction [124]
113 Marol Naka* मरोळ नाका Line 1
Line 3
Elevated; Underground Side and Island Operational from
8 June 2014; Operational from 5 October 2024
[125][126]
114 MBMC Sports Complex एमबीएमसी क्रीडा संकुल Line 9 Elevated Side Under construction [127]
115 MIDC एमआयडीसी Line 3 Underground Island Under construction [128]
116 MTNL, BKC एमटीएनएल, बीकेसी Line 2 Elevated Side Under construction [129]
117 Mulund Fire Station मुलुंड अग्निशामक केंद्र Line 4 Elevated Side Under construction [130]
118 Mulund Naka मुलुंड नाका Line 4 Elevated Side Under construction Also known as Mulund Check Naka metro station [131]
119 Mumbai Central†† मुंबई सेंट्रल Line 3 Underground Island Under construction Transfer station to Mumbai Central railway station [132]
120 Nanavati Hospital नानावटी रुग्णालय Line 2 Elevated Side Under construction [133]
121 National College (Bandra) राष्ट्रीय महाविद्यालय (वांद्रे) Line 2 Elevated Side Under construction Link to National College [134]
122 Naval Housing नौदल हाउसिंग Line 4 Elevated Side Under construction [135]
123 Nilaje Gaon निळजे गाव Line 12 Elevated Side Under construction
124 Oshiwara ओशिवरा Line 2 Elevated Side Operational from 19 January 2023 - [136]
125 Pandurang Wadi पांडुरंग वाडी Line 9 Elevated Side Under construction Also known as Dahisar Check Naka metro station [137][138]
[139]
126 Pant Nagar पंत नगर Line 4 Elevated Side Under construction [140]
127 Pisarve Depot पिसार्वे डेपो Line 12 Elevated Side Under construction
128 Pisarve पिसार्वे Line 12 Elevated Side Under construction
129 Pisavali Gaon पिसवली गाव Line 12 Elevated Side Under construction
130 Powai Lake पवई तलाव Line 6 Elevated Side Under construction [141]
131 Prem Nagar प्रेम नगर Line 2 Elevated Side Under construction [142]
132 Purna पूर्णा Line 5 Elevated Side Under construction [143]
133 Rajnouli Village रांजणोली गाव Line 5 Elevated Side Under construction [144]
134 Rambaug (Powai) रामबाग (पवई) Line 6 Elevated Side Under construction [145]
135 RTO Thane आरटीओ ठाणे Line 4 Elevated Side Under construction [146]
136 Rushi Sankul ऋषी संकुल Line 2 Elevated Side Operational from
2 April 2022
Also known as Kandarpada metro station [147]
137 Sagaon सागाव Line 12 Elevated Side Under construction
138 Sahajanand Chowk सहजानंद चौक Line 5 Elevated Side Under construction [148]
139 Sahar Road सहार मार्ग Line 3 Underground Island Operational from 5 October 2024 [149][150]
140 Sai Baba Nagar साई बाबा नगर Line 9 Elevated Side Under construction Also known as Shivar Garden metro station [151]
141 Saki Naka साकी नाका Line 1 Elevated Side Operational from
8 June 2014
[152]
142 Saki Vihar Road साकी विहार रोड Line 6 Elevated Side Under construction [153]
143 Goregaon (West) गोरेगाव (पश्चिम) Line 2 Elevated Side Operational from 19 January 2023 - [154]
144 Santacruz†† सांताक्रुझ Line 3 Underground Island Operational from 5 October 2024 Transfer station to Santacruz railway station [155]
145 Saraswat Nagar सारस्वत नगर Line 2 Elevated Side Under construction [156]
146 Science Museum विज्ञान संग्रहालय Line 3 Underground Island Under construction [157]
147 SEEPZ* सीप्झ Line 3 Underground Island Operational from 5 October 2024 Interchange station to Pink Line 6 on SEEPZ Village metro station [158]
148 SEEPZ Village* सीप्झ गाव Line 6 Elevated Side Under construction Interchange station to Aqua Line 3 on SEEPZ metro station [159]
149 Sewri†† शिवडी Line 11 Underground Island Under construction Transfer station to Sewri railway station
150 SG Barve Marg एसजी बर्वे मार्ग Line 2 Elevated Side Under construction [160]
151 Shahid Bhagat Singh Garden शहीद भगतसिंग उद्यान Line 9 Elevated Side Under construction Also known as Maxus Mall metro station [161]
152 Shangrila शांग्रीला Line 4 Elevated Side Under construction [162]
153 Shankarwadi शंकरवाडी Line 7 Elevated Side Under construction [163]
154 Shastri Nagar (Mumbai)* शास्त्री नगर Line 2 Elevated Side Operational from 19 January 2023 Interchange with Pink Line 6 on Adarsh Nagar (Mumbai) metro station and also called as Lower Oshiwara metro station [164]
155 Shitladevi Temple शितलादेवी मंदिर Line 3 Underground Island Under construction Also known as Mahim metro station [165][166]
156 Shivaji Chowk (Chembur) शिवाजी चौक (चेंबूर) Line 2 Elevated Side Under construction [167]
157 Shivaji Chowk (Mira Road)†* शिवाजी चौक (मिरा रोड) Line 10
Line 13[lower-alpha 2]
Elevated Side Under construction Interchange with Red Line 9 on Amar Palace (Miragaon) metro station [168]
158 Shreyas Cinema श्रेयस सिनेमा Line 4 Elevated Side Under construction [169]
159 Shrinath Nagar (Ovaripada) श्रीनाथ नगर (ओवरीपाडा) Line 7 Elevated Side Operational from
2 April 2022
[170]
160 Shyam Nagar (Mumbai) श्याम नगर Line 6 Elevated Side Under construction [171]
161 Siddharth Colony सिद्धार्थ कॉलनी Line 4 Elevated Side Under construction [172]
162 Siddhivinayak Temple सिद्धीविनायक मंदिर Line 3 Underground Island Under construction [173]
163 Sonapur सोनापूर Line 4 Elevated Side Under construction [174]
164 Sonarpada सोनारपाडा Line 12 Elevated Side Under construction
165 Subhash Chandra Bose Stadium सुभाषचंद्र बोस स्टेडियम Line 9 Elevated Side Under construction [175]
166 Suman Nagar सुमन नगर Line 4 Elevated Side Under construction [176]
167 Surya Nagar सूर्य नगर Line 4 Elevated Side Under construction [177]
168 Swami Samarth Nagar (Lokhandwala) स्वामी समर्थ नगर (लोखंडवाला) Line 6 Elevated Side Under construction [178]
169 Taloja†* तळोजा Line 12 Elevated Side Under construction Interchange with Line 1 (Navi Mumbai Metro) on Panchnand metro station
170 Teen Haath Naka (Thane) तीन हात नाका (ठाणे) Line 4 Elevated Side Under construction [179]
171 Temghar टेमघर Line 5 Elevated Side Under construction [180]
172 Devipada देवीपाडा Line 7 Elevated Side Operational from
2 April 2022
[181][182]
173 Tikuji-ni-wadi टिकुजीनीवाडी Line 4 Elevated Side Under construction [183]
174 Turbhe तुर्भे Line 12 Elevated Side Under construction
175 Vadavali वडवली Line 12 Elevated Side Under construction
176 Waklan वाकळण Line 12 Elevated Side Under construction
177 Varsova Char Phata वर्सोवा चार फाटा Line 10 Elevated Side Under construction
178 Versova वर्सोवा Line 1 Elevated Side Operational from
8 June 2014
[184]
179 Vidhan Bhavan विधान भवन Line 3 Underground Island Under construction [185][186]
180 Vidyanagri विद्यानगरी Line 3 Underground Island Operational from 5 October 2024 Also known as Mumbai University (Kalina) metro station [187]
181 Vijay Garden विजय गार्डन Line 4 Elevated Side Under construction [188]
182 Vikhroli EEH विक्रोली इ.इ.एच. Line 6
Line 14[lower-alpha 3]
Elevated Side Under construction Also known as Tagore Nagar Junction metro station [189][190]
[191][192]
183 Vikhroli†† विक्रोळी Line 4 Elevated Side Under construction Transfer station to Vikhroli railway station [193]
184 Vitt Bhatti Junction (Dindoshi) वीट भट्टी जंक्शन (दिंडोशी) Line 7 Elevated Side Operational from
2 April 2022
[194]
185 Wadala Truck Terminal वडाळा ट्रक टर्मिनल Line 4 Elevated Side Under construction Also Known as Wadala TT metro station [195]
186 Wadi Bunder वाडी बंदर Line 11 Elevated Island Under construction
187 Western Express Highway* पश्चिम द्रुतगती महामार्ग Line 1 Elevated Side Operational from
8 June 2014
Interchange with Red Line 7 on Andheri (East) metro station [196]
188 Worli वरळी Line 3 Underground Island Under construction [197][198]
189 Kashigaon काशिगाव Line 9 Elevated Side Under construction Also known as Pleasant Park metro station [199][200]
Close

Statistics

Total number of metro stations 189
Total number of metro stations under construction 178
Number of interchange stations 38
Number of Elevated stations 155
Number of underground stations 33
Number of At-Grade stations 1

Notes

  1. Currently, The metro stations of Gold Line 8 are at the DPR stage after that the number of stations should be increased.
  2. Currently, The metro stations of Purple Line 13 at the DPR stage after that the number of stations should be increased.
  3. Currently, The metro stations of Magenta Line 14 are at the DPR stage after that the number of stations should be increased.

See also

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.