scaled-down station design was released in 2016. A design-build contract was issued in 2017. In January 2020, the station was renamed Medford/Tufts under an
Railroad opened through Somerville and Medford in 1835. It crossed the Middlesex Canal south of West Medford; the canal failed after the railroad's completion
Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two
developed plans to build a 60-acre (240,000 m2) auto mall north of downtown Medford and to build a new corporate headquarters in downtown Medford. The Chrysler