Guruvayur–Thrissur section is a spur line functioning under Trivandrum railway division of Southern Railway zone. This is a single broad-gauge line which begins at Thrissur city and ends at Guruvayur in Thrissur district of Kerala. The 23 kilometres (14 mi) section was opened for traffic in the year 1994. The line connects the Cultural Capital of Kerala, Thrissur to the Temple Town of Kerala, Guruvayur, the fourth biggest temple in India in terms of the number of devotees per day.[1][2][3]

Quick Facts Overview, Status ...
Guruvayur–Thrissur spur line
View of Thrissur railway station
Overview
StatusOperational
OwnerSouthern Railway zone
LocaleThrissur district
Termini
Stations2
Websitehttp://www.sr.indianrailways.gov.in/
Service
TypeRegional rail
SystemElectrified
Services3
Operator(s)Thiruvananthapuram railway division
Depot(s)Thrissur
Rolling stockWAP-4, WAP-7, WAG-5
History
Opened9 January 1994; 30 years ago (1994-01-09)
Technical
Line length23 kilometres (14 mi)
Track length90 km
Number of tracks1
Charactersingle-line
Track gauge1,676 mm (5 ft 6 in)
ElectrificationFully
Operating speed90 km/h (56 mph)
Route map

km
0
Guruvayur Parking
Aloor River
Puvathur Canal
15
Amala Nagar
Right arrow to Shoranur Junction
21
Punkunnam
Kottapuram overpass
Azhekoddan Road
23
Thrissur Parking
Down arrow to Ernakulam Junction
Close

History

In 1983, Kamalapati Tripathi, then Minister of Railways (India) announced the construction of Thrissur–Guruvayur–Kuttippuram section. But following stiff opposition from the local people, Kuttipuram was dropped. On 19 January 1985 Indian Railways officially notifies Guruvayur–Tanur line for construction as temple town is a notified pilgrimage area. Rajiv Gandhi, then Prime Minister of India in 1987 inaugurated the first alignment line of Guruvayur–Tanur section.

On 9 January 1994 the first phase of the Thrissur–Guruvayur section was inaugurated by Prime Minister of India, Narasimha Rao. On 17 December 1995, Suresh Kalmadi and then Chief Minister of Kerala Kannoth Karunakaran inaugurated the work for the Guruvayur–Kuttipuram line. But later Kuttipuram was dropped once more and Indian Railways in 1997 give the green signal for Guruvayur–Tanur line. 51.25 km Guruvayur–Tanur railway line survey report was submitted to Indian Railways in July 1998. The project was sanctioned in 1999. The final surveys were done for the Guruvayur–Tanur railway line in January 2003, which will cover 51 km. In October 2009, Guruvayur–Tirunavaya alignment was chosen by Indian Railways.[2][4][5]

Thumb
Commemorative plaque of Kuttipuram–Guruvayoor section in Guruvayoor railway station

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.