Top Qs
Timeline
Chat
Perspective

Acholibur–Gulu–Olwiyo Road

Road in Uganda From Wikipedia, the free encyclopedia

Remove ads

The Acholibur–Gulu–Olwiyo Road is a road in the Northern Region of Uganda, connecting the town of Acholibur to the city of Gulu and the town of Olwiyo.

Quick facts Route information, Length ...
Remove ads

Location

The road starts at Acholibur, a small town on the KitgumLira road, approximately 19 kilometres (12 mi) south of Kitgum.[1] The road continues in a southwesterly direction to Gulu (2014 population: 152,276), the most populous city in the Northern Region.[2] The road then continues through Nwoya and Anaka to end at Olwiyo in Nwoya District, a distance of about 150 kilometres (93 mi).[3] The road connects the districts of Kitgum, Pader, Gulu, and Nwoya. The coordinates of the road near Gulu are 2°48'24.0"N, 32°19'29.0"E (Latitude:2.806667; Longitude:32.324722).[4]

Remove ads

Upgrading to bitumen

In 2009, the Ugandan government commissioned a feasibility study and detailed engineering design for this road and the Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road, both in northern Uganda. The reports became available in 2013.[5] On 21 February 2015, the upgrade from unsealed gravel surface to class II bitumen surface was commissioned by President Yoweri Museveni. The work on the 73 kilometres (45 mi) from Acholibur to Unyama is assigned to China Railway No.5 Engineering Group. The 70 kilometres (43 mi) road section from Unyama to Olwiyo was upgraded by Jiangxi Zhongmei Engineering Construction Company Limited. Work was expected to last three years.[6] The road project is fully funded by the Ugandan government.[7]

Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads