Top Qs
Timeline
Chat
Perspective
Batang–Semarang Toll Road
Toll Road in Indonesia From Wikipedia, the free encyclopedia
Remove ads
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Remove ads
Remove ads
Sections
Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:
- Section I, beginning of project - East Batang (3.2 km)
- Section II, East Batang - Weleri (36.35 km)
- Section III, Weleri - Kendal (11.05 km)
- Section IV, Kendal - Kaliwungu (13.5 km)
- Section V, Kaliwungu - Krapyak (10.9 km)
Exits and Gates
Summarize
Perspective
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Remove ads
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads