Top Qs
Timeline
Chat
Perspective
Chesapeake and Ohio class M-1
American steam turbine locomotives (1947–1949) From Wikipedia, the free encyclopedia
Remove ads
The Chesapeake and Ohio class M-1 was a fleet of three steam turbine locomotives built by the Baldwin Locomotive Works for the Chesapeake and Ohio Railway in 1947–1948 for service on the Chessie streamliner. As diesel locomotives became more prevalent following World War II, the C&O was one of several railroads that were reluctant to abandon coal as a fuel source, and saw coal-fueled steam turbine technology as a possible alternative to diesel. At the time of its construction, the M-1 was the longest single-unit locomotive in the world.
Remove ads
Remove ads
Design
Summarize
Perspective
The M-1 was a collaboration between the C&O, the Baldwin Locomotive Works, and Westinghouse.[4]: 202 The C&O possessed substantial coal-hauling revenue and was loath to abandon it as a fuel source.[5]: 109 Further, C&O's engineering staff expressed concern that oil reserves would be exhausted within 25–30 years.[3]: 109 The locomotive contained a Westinghouse turbine that drove four direct current (DC) generators, mounted in pairs.[6]: 116 Each generator produced 1,000 kilowatts (1,300 hp) and collectively powered eight traction motors.[1]: 161
Unlike typical steam locomotives, the M-1's boiler was in the rear and its coal bunker was in the front. In addition, lacking cylinders, its turbine/generator drive system had fewer moving parts which, in theory, meant that it required far less maintenance than conventional steam locomotives; its designers predicted that it could make a round trip between Washington and Cincinnati without servicing.[3]: 110–111
The locomotive's throttle had 11 settings, ranging from 1 (idle) to 11 (full speed). During a trial run with a reporter from Popular Mechanics aboard, a C&O engineer expressed his dissatisfaction with a local speed limit of 75 miles per hour (121 km/h), noting that he would "sure like to be able to pull [the throttle from position 7] back to 11!"[3]: 110, 252 Not including research and development, the three locomotives cost US$1.6 million.[7]: 45
Remove ads
Use
The C&O cancelled the Chessie in 1948 before it ran in revenue service.[4]: 202 Unable to fill the role for which they were intended, the M-1s were instead used between Clifton Forge and Charlottesville, Virginia, where they proved expensive to operate and mechanically unreliable before being scrapped in 1950.[8]: 62 [2]: 141
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads