Top Qs
Timeline
Chat
Perspective
Chinese ship Chang Da Long
Ship From Wikipedia, the free encyclopedia
Remove ads
Chinese roll-on/roll-off ship Chang Da Long (长达隆) is a military/civilian dual use cargo ship built in the People’s Republic of China (PRC) for the People's Liberation Army Navy (PLAN).[1][2][3][4] Built by Jinling Shipyard (金陵) at Nanjing, the ship begun sea trials in November 2012,[2][3] and first entered civilian service in the following year.
Chang Da Long is a pure car and truck carrier (PCTC), capable of carrying 2200 cars at its maximum capacity. Out of its eight decks,[1][3][4] the maximum clearance of third and fifth decks is 4.5 meter, enable it to carry bulk equipment and large vehicles.[3][4] The ship is also equipped with helicopter deck,[3][4] and is able to transport two fully equipped mechanized battalions.[3] Usually deployed as a PCTC for civilian use in peace time, the ship will be activated during national emergency for governmental and military mission, with this role first successfully performed in a military exercise in 2015.[4] Specification:[1][2][3][4]
- Length: 140.5 meter
- Beam: 24.4 meter
- Tonnage: 20000 gross ton
Remove ads
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads