Comanche Peak Nuclear Power Plant

Nuclear power station in Texas From Wikipedia, the free encyclopedia

Comanche Peak Nuclear Power Plantmap
Remove ads

Comanche Peak Nuclear Power Plant is located in Somervell County, Texas. The nuclear power plant is located 40 miles (64 km) southwest of Ft. Worth and about 60 miles (97 km) southwest of Dallas. It relies on nearby Comanche Creek Reservoir for cooling water. The plant has about 1,300 employees and is operated by Luminant Generation, a subsidiary of Vistra Corp.

Quick Facts Country, Location ...
Remove ads

The Engineer of Record is Gibbs & Hill, Inc. of New York, New York.[citation needed]

Construction of the two Westinghouse pressurized water reactors began in 1974. Unit 1, originally rated at 1,084 MWe, came online on April 17, 1990. Its current, 40-year operating license is valid until February 8, 2030. Unit 2, 1,124 MWe, followed on April 6, 1993 and is licensed to operate until February 2, 2033 when it has to renew its license. Of the nuclear plants to begin construction prior to 1979, Unit 2 was among the last power reactors to come online in the United States, followed only by Units 1 and 2 at Watts Bar. Vogtle Units 3 & 4 were brought online in 2023 and 2024, respectively.

In June 2008, the U.S. Nuclear Regulatory Commission (NRC) approved a request to increase the generating capacity of Units 1 and 2 by approximately 4.5% each. Luminant Generation Co. implemented the changes during refueling outages. Unit 1 was uprated in autumn 2008 with a capacity increase of approximately 1,210 to 1,259 MWe and Unit 2, the capacity of which rose from an estimated 1,208 to 1,245 MWe, was uprated in autumn 2009.[1]

Remove ads

Proposed units 3 and 4

Summarize
Perspective

On September 19, 2008, Luminant filed an application with the NRC for a Combined Construction and Operating License (COL) for two new reactors.[2] The reactor design selected is the US version of the 1,700 MWe Advanced Pressurized Water Reactor (US-APWR), developed by Mitsubishi Heavy Industries (MHI). The project is a joint venture, with Luminant owning 88 percent and 12 percent owned by MHI.[3] Luminant did not release an estimate of the project's cost, but CEO David Campbell said Luminant would try to build its new reactors at the low end of current industry estimates, which he said range from $2,500 to $6,000 a kilowatt — $8.5 billion to $20.4 billion for a 3,400 MW plant.[4]

Some environmental and anti-nuclear organizations and individuals opposed the plant expansion, citing environmental, public safety and cost concerns. These included the Sustainable Energy and Economic Development Coalition, Public Citizen and state representative Lon Burnam.[5]

As of November 2013, expansion had been suspended due a natural gas boom dramatically lowering power prices in Texas, and Mitsubishi Heavy Industries suspending development of its reactor design to focus on restarting its reactors in Japan. The Texas power generation company did not withdraw its application to the NRC entirely, leaving open the possibility that it might eventually expand.[6][7]

Remove ads

Electricity production

Summarize
Perspective

Comanche Peak generated 19,687 GWh in 2022.

More information Year, Jan ...
Remove ads

Surrounding population

The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[9]

The 2010 U.S. population within 10 miles (16 km) of Comanche Peak was 30,653, an increase of 44.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 1,755,528, an increase of 22.9 percent since 2000. Cities within 50 miles include Fort Worth (41 miles to city center).[10]

Seismic risk

The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Comanche Peak was 1 in 250,000, according to an NRC study published in August 2010.[11][12]

Reactor data

The Comanche Peak Nuclear Power Plant consists of two operational reactors, two additional units are planned.

More information Reactor unit, Reactor type ...
Remove ads

See also

Notes

  1. Technically it's unclear if the operator is Luminant Generation Company LLC or Vistra Operations Company LLC, as the NRC lists the plant's operator as TEX Operations Company LLC, which was the former name of Vistra Operations Company LLC, yet PRIS lists Luminant Generation Company LLC. However since Luminant is indirectly owned by Vistra, it seems to be a moot point, so the operator listed is the one from PRIS (which is more likely to be up to date).