Top Qs
Timeline
Chat
Perspective

Derby–Shelton station

Metro-North Railroad station in Connecticut From Wikipedia, the free encyclopedia

Derby–Shelton stationmap
Remove ads

Derby–Shelton station (signed as Derby/Shelton) is a commuter rail station on the Waterbury Branch of the Metro-North Railroad New Haven Line, serving the cities of Derby and Shelton, Connecticut. It is the southernmost stop on the Waterbury Branch before trains merge onto the Northeast Corridor.

Quick facts General information, Location ...
Remove ads

Station layout

The station has one three-car-long low-level side platform to the west of the single track.

The station is owned and operated by the Connecticut Department of Transportation, but Metro-North is responsible for maintaining platform lighting as well as trash and snow removal.[1] The 75-space parking lot[2] is managed by the Naugatuck Valley Council of Governments.[1]

Future station

With the completion of the Waterbury Branch Signalization project upgrading capacity for future 30 minute service headways, Governor Lamont announced on November 14, 2021 that 7 new trains will be coming to the Waterbury Line in 2022 and the Derby-Shelton Train Station was a priority in getting new riders onto the line.[4] Paired with the development of Route 34 and the new Derby-Shelton Bridge, the new station will function as a new multimodal center for Derby and its new residents. The new station received 12.6 million in Federal Funds 6 days later and later received another 12.4 from the State of Connecticut on December 21, 2021.[5][6] As of 2024 construction is to take place from 2025 to 2027.[7]

Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads