Top Qs
Timeline
Chat
Perspective

Downtown San José station

Planned underground BART stop From Wikipedia, the free encyclopedia

Downtown San José station
Remove ads

Downtown San José station[1][2] is a proposed underground Bay Area Rapid Transit station underneath Santa Clara Street in Downtown San Jose, planned as part of Silicon Valley BART extension Phase II. The station would be co-located with the Santa Clara Valley Transportation Authority's existing Santa Clara light rail station, and be located between the proposed 28th Street/Little Portugal station and a transfer station at San Jose Diridon Station. The station eventually connects to the proposed Santa Clara BART station.[3] Revenue service, which will be served by the Orange and Green Lines, is envisioned to start in 2036.[4][5]

Quick facts General information, Location ...
Remove ads

History

The original plan for the Silicon Valley BART extension included the Downtown San José station, but full funding could not be secured[6] and the San Jose extension was split into two phases. Phase I, completed on June 13, 2020, was the extension to Berryessa/North San José station.[7] The proposed Downtown San José station is part of a later, unfunded phase II of the Silicon Valley BART extension[8] and would be located between the proposed 28th Street/Little Portugal and Diridon BART stations. Construction is planned to begin in 2024, and revenue service to start in 2036.[4][5]

Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads