Top Qs
Timeline
Chat
Perspective
Durg–Raipur–Arang Expressway
Road in Chhattisgarh, India From Wikipedia, the free encyclopedia
Remove ads
Durg–Raipur–Arang Expressway is underconstructed 92 km (57 mi) long, six-lane, access-controlled greenfield expressway in the state of Chhattisgarh, India. The expressway is a part of Bharatmala Pariyojana, and will pass from Durg through Anjora, Patora, Supkona, Abhanpur and Naya Raipur before terminating at Arang.[1][2]
Remove ads
Status updates
- Aug 2020: The target date for completion of proposed expressway is set as March 2024.[3]
- Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 km[citation needed]
See also
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads