East Coast Integrated Depot

MRT and bus depot in Singapore From Wikipedia, the free encyclopedia

East Coast Integrated Depotmap
Remove ads

The East Coast Integrated Depot (ECID) is a large integrated bus and train depot located in Changi, Singapore. It will serve three Mass Rapid Transit (MRT) lines: the East–West line (EWL), the Downtown line (DTL) and the Thomson–East Coast line (TEL). It is currently under construction, with expected completion in the second half of 2026.

Quick Facts Location, Coordinates ...

The depot will be located beside the current site of Changi Depot, which will be demolished.[1] It will be the first MRT depot in Singapore to serve three MRT lines and also the third to be integrated with a bus depot in Singapore after the Tuas Depot on the East–West line and Gali Batu Depot on the Downtown line.

With this design, it is estimated that there will be a 44 hectares of land will be saved, equivalent to approximately 60 football fields. The depot will be able to house approximately >200 trains of varying sizes and lengths and >550 buses within the site.[2]

Remove ads

History

It was first announced in August 2014 with an expected completion by 2024 but was delayed to 2026 due to the COVID-19 pandemic. Contract T301 for the construction of East Coast Integrated Depot, reception tunnels and its associated facilities was awarded to GS Engineering & Construction Corporation at a sum of S$1.99 billion on 21 March 2016. Construction began in 2016 and was initially planned for completion in 2024.[1][3][4]

Structural works reached 75% completion in September 2022,[5] and 98% in November 2024.[6] It was also announced previously that the opening of the depot is pushed back to 2026.[6]

Remove ads

Description

Summarize
Perspective
Thumb
Model of the East Coast Integrated Depot

The East Coast Integrated Depot consists of a multi-level train depot and a multi-level bus depot.

Train depot

The train depot will have three levels containing three separate depots for three different MRT lines. The underground portion will house a 66-track depot for the Downtown line, and will be brought into use following the opening of Stage 3e of the line. The at-grade portion will house a 62-track depot for the future Thomson–East Coast line, to be used following the completion of Stage 5 of the line. Finally, the elevated portion will house a 72-track depot for the East–West line, which will replace the existing Changi Depot. All three depots will operate independently of each other, a first for Singapore, and will be designed to be able to handle trains of different lengths, of 3, 4 and 6 respectively of the lines they operate on.

The facility will be located between Simei station and Tanah Merah station on the East–West line, between Xilin station and Sungei Bedok station on the Downtown line, and off Sungei Bedok station on the Thomson–East Coast line. It will also connect to Tanah Merah station on the Thomson–East Coast line after the Changi Airport Branch is absorbed into the line.

The depot has nine reception tracks:

  • 2 tracks eastbound towards Simei station for the EWL.
  • 1 track westbound towards Tanah Merah station for the EWL.
  • 1 track eastbound towards Xilin station for the DTL.
  • 4 tracks westbound towards Sungei Bedok station for the DTL and TEL.
  • 1 track westbound towards Tanah Merah station for the TEL.

Bus depot

The bus depot is a separate three-storey structure situated next to the train depot on the same site. Similar to Soon Lee Bus Depot and Woodlands Bus Depot, it will contain workshops on the ground level, while the upper two levels will contain parking spaces. It will be replacing Changi Bus Park but the bus package will be under Tampines Bus Package and it will only have 550 parking lots.