Exploration Flight Test-1

2014 unmanned test flight of the Orion spacecraft by NASA From Wikipedia, the free encyclopedia

Exploration Flight Test-1
Remove ads

Exploration Flight Test-1 or EFT-1 (previously known as Orion Flight Test 1 or OFT-1) was a technology demonstration mission and the first flight test of the crew module portion of the Orion spacecraft. Without a crew, it was launched on December 5, 2014 at 12:05 UTC (7:05 am EST, local time at the launch site) by a Delta IV Heavy rocket from Space Launch Complex 37B at the Cape Canaveral Air Force Station.[3]

Quick facts Names, Mission type ...

The mission was a four-hour, two-orbit test of the Orion crew module featuring a high apogee on the second orbit and concluding with a high-energy reentry at around 8.9 kilometers per second (20,000 mph).[4] This mission design corresponds to the Apollo 2/3 missions of 1966, which validated the Apollo flight control system and heat shield at re-entry conditions planned for the return from lunar missions.

Remove ads

Objectives

Summarize
Perspective
Thumb
Rendering of Orion capsule and Delta IV upper-stage during EFT-1

EFT-1 tested several systems of the crew module portion of the Orion spacecraft, including separation events, avionics, heat shield performance, parachutes, and recovery operations. The uncrewed test flight served as a precursor to Orion’s first mission aboard the Space Launch System (SLS) on Artemis I. Because the European Service Module was not yet available, Orion flew with a structural representation. It also carried only a partial launch abort system, limited to the motor used to jettison the system at the end of launch, along with an Orion-to-stage adapter designed for future use with the SLS.[5]

For the mission, Orion remained attached to the dummy service module, which itself was connected to the Delta IV Heavy’s upper stage. This stage was nearly identical to the Interim Cryogenic Upper Stage planned for the Block 1 version of the SLS. Unlike future flights, Orion relied on internal batteries for power rather than photovoltaic arrays.[6]

Data returned from EFT-1 informed Orion’s design and were incorporated into its critical design review (CDR) in April 2015.[7] These results helped pave the way for the Artemis I mission, which launched on November 16, 2022,[8] more than seven years after EFT-1.

Remove ads

Vehicle assembly

Orion CM-001 used on the EFT-1 mission was built by Lockheed Martin.[9] On June 22, 2012, the final welds of the EFT-1 Orion were completed at the Michoud Assembly Facility in New Orleans, Louisiana.[9] It was then transported to Kennedy Space Center's Operations and Checkout Building, where the remainder of the spacecraft was completed.[10] The Delta IV rocket was put in a vertical position on October 1, 2014, and Orion was mated with the vehicle on November 11.[11][12][13]

Remove ads

Flight

Summarize
Perspective
Thumb
Mission diagram

The four-and-a-half-hour flight took the Orion spacecraft on two orbits of Earth. Peak apogee was approximately 5,800 kilometres (3,600 mi). The distance allowed the spacecraft to reach reentry speeds of up to 8.9 km/s (20,000 mph), which exposed the heat shield to temperatures up to around 2,200 °C (4,000 °F).[4][5]

More information Time, Event ...

After splashdown in the Pacific Ocean, crews from the USS Anchorage recovered the EFT-1 Orion crew vehicle. Plans were later made to outfit the capsule for an ascent abort test in 2017.[15]

Launch attempts

More information Attempt, Planned ...
Remove ads

Public outreach

NASA heavily promoted the mission, collaborating with Sesame Street and its characters to educate children about the flight test and the Orion spacecraft.[16]

The Orion capsule used for EFT-1 is now on display at the Kennedy Space Center Visitor Complex, in the "NASA Now" exhibit.[17]