Top Qs
Timeline
Chat
Perspective

Expressway S2 (Poland)

Southern Bypass of Warsaw in the Polish highway system From Wikipedia, the free encyclopedia

Expressway S2 (Poland)map
Remove ads

Expressway S2 is a short highway in Poland, serving as the southern section of the (partially completed) Warsaw Express Ring Road. Conceptually forming one continuous route with motorway A2, it was initially planned (since 1970s) as a part of it, however after local Warsaw residents objected to the plans of an inner-city motorway, the proposed road was downgraded to an expressway (though the actual route was not changed). The western half of the road was opened to traffic in 2013, while the eastern half was opened in 2020 and 2021.

Quick facts Route information, Length ...
Thumb
Puławska Exit in 2016 before the construction of the Ursynów tunnel
Thumb
The S2 south of Warsaw-Okecie Airport,Interchange "Opacz", view on S7 in Kraków direction, September 2013
Remove ads

Chronology

Summarize
Perspective

Construction of the first phase of the project was divided into two sections. Work on a 3.9 km stretch between Warszawa Lotnisko junction (linking to expressway S79) and Puławska junction at the eastern end of this phase of the project began in September 2009,[1] while construction of the other, 11.1 km long section between the western Konotopa junction (linking the motorway A2 and the western portion of the ring road, expressway S8) and Warszawa Lotnisko junction, began in the Summer of 2010.[2]

Both sections were scheduled to be completed in mid 2012 in time for the Euro 2012 football championships, however this deadline was not met.[3] The S2 Expressway was eventually opened in a number of stages, beginning in the west at Konotopa junction in August 2013, with further sections opening in September 2013, linking the road with expressway S79 leading to Warsaw Chopin Airport. The final part of this phase of the project up to Puławska junction was opened in late September 2013.

The second phase of the project took the expressway S2 east of Puławska across the Vistula river, through the Anna Jagiellon Bridge, connecting the route with the eastern part of the Warsaw Express Ring Road and the continuation of the motorway A2 eastwards. The design-and-build tender for this section (divided into 3 separate contracts) was announced on December 18, 2013, with completion date specified as 41 months from the date contract is signed (not counting 3 winter months).[4] The contract was signed in December 2015, with completion planned for December 2020. The final section including the Ursynów Tunnel opened on 20 December 2021.[5]

The contracts were:[citation needed]

Future developments

From 2025, on the section between Wilanow and Lubelska junctions, average speed measurement devices will be installed to reduce noise pollution.[6]

Remove ads

Ursynów tunnel

Summarize
Perspective
Quick facts Overview, Official name ...

The Expressway S2 Tunnel (Polish: Tunel drogi ekspresowej S2) or Ursynów Tunnel (Polish: Tunel pod Ursynowem) is a part of the S2 expressway in Warsaw.[7] The tunnel began construction on 1 March 2017 and opened on 20 December 2021.[5] The contractor was Astaldi SpA.[8]

As of 2021, the tunnel is the longest road tunnel in Poland.[9] From the west, the tunnel entry begins at Węzeł Ursynów Zachód junction. In the east, the tunnel joins the Węzeł Ursynów Wschód junction. The tunnel is around 2330 meters in length (some sources claim 2335 meters in length), and crosses underneath the pre-existing tunnel of the Warsaw Metro Line M1. Each of the two roadways has a width of 14.5 meters, with three traffic lanes each, and a hard shoulder 3.75 meters in width. Each roadway has a 1-meter wide emergency path.

Remove ads

Route description

Summarize
Perspective
More information Country, Voivodeship ...


Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads