The Sandhayak-class survey vessels are a series of four survey vessels being built by Garden Reach Shipbuilders and Engineers (GRSE), Kolkata for the Indian Navy. The first vessel was commissioned in 2021. The primary role of the vessels would be to conduct coastal and deep-water hydrographic survey of ports, navigational channels, Exclusive Economic Zones and collection of oceanographic data for defence. Their secondary role would be to perform search & rescue, ocean research and function as hospital ships for casualties.[1][2][3][4]

Quick Facts Class overview, General characteristics ...
Remove ads
Remove ads

History

In April 2016, the Indian Navy issued a request for proposal to six shipyards, four public and two private, for the construction of four large survey vessels. In September 2017, Garden Reach Shipbuilders and Engineers (GRSE) emerged as the lowest bidder with a bid of 2,435.15 crore (equivalent to 34 billion or US$400 million in 2023), beating L&T Shipbuilding by 742 crore (equivalent to 10 billion or US$120 million in 2023). The contract was awarded to GRSE by the Ministry of Defence on 30 October 2018. The first ship is expected to be delivered within 36 months from the date of signing the contract.[1][2][5]

Remove ads

Design

The ships have a displacement of 3,300 tonnes (3,248 long tons) and a length of 110 metres (360 ft 11 in). They have a cruising speed of 16 knots (30 km/h; 18 mph) with a maximum speed of 18 knots (33 km/h; 21 mph) and an operating range of 6,500 nautical miles (12,000 km; 7,500 mi) at a speed of 14 to 16 knots (26 to 30 km/h; 16 to 18 mph). The ships have a complement of 231 and are equipped with hydrographic sensor equipment and a hangar which can accommodate one advanced light helicopter. In the secondary role, the ships can be fitted with a CRN 91 naval gun. In addition, the vessels will follow MARPOL (marine pollution) Standards of the International Maritime Organisation and will be built per Classification Society Rules and Naval Ship Regulations.[1][5][6]

Remove ads

Development

The keel of the first ship Sandhayak ,named after its predecessor Sandhayak, was laid down on 8 November 2019 and launched on 5 December 2021. It was expected to be commissioned by 2023, the boat was commissioned on 3 February 2024.[7][8][9]

The second vessel of the class, Nirdeshak , was laid on 1 December 2020 and was subsequently launched on 26 May 2022. The ship was delivered to the Indian Navy on 8 October 2024.[10] The ship was commissioned on 18 December 2024.[11]

The third ship, Ikshak, was laid down on 6 August 2021 and launched on 26 November 2022.[12][13]

The fourth and the last ship, Sanshodhak, was laid down on 17 June 2022, and launched on 13 June, 2023.[14]

Ships of the class

More information Name, Pennant ...