Top Qs
Timeline
Chat
Perspective

Hanoi–Lao Cai Expressway

Road in Vietnam From Wikipedia, the free encyclopedia

Hanoi–Lao Cai Expressway
Remove ads

The Hanoi–Lao Cai Expressway Another name Noi Bai–Lao Cai Expressway (Vietnamese: Đường cao tốc Nội Bài - Lào Cai, labelled CT.05) is an expressway section of the Expressways of Vietnam, 265 km long and has its starting point at the intersection of National Highway 18 with National Highway 2 in Thanh Xuân commune, Sóc Sơn district], Hanoi city and the end point at Duyên Hải ward, Lào Cai, Lào Cai province, connecting with G8011 Kaiyuan–Hekou Expressway at Lào Cai International Border Gate. This Expressway is part of the Asian Highway Network (AH14) and Transport infrastructure development project KunmingHanoiHai Phong economic corridor.

Quick facts CT.05 Expressway, Route information ...

This route passes through 5 provinces and cities: Hanoi (12 km), Vĩnh Phúc (40 km), Phú Thọ (62 km), Yên Bái (65 km) and Lào Cai (83 km).


Remove ads

Construction

Construction on the expressway began in 2009 with a total investment of US$1.46 billion. The Asian Development Bank provided a US$1 billion loan for development of the expressway.[1] South Korean Posco Group won 3 of the 8 bids, China's Guangxi Road & Bridge Engineering won 2 bids and Vietnamese Vinacomex won one.[2][3][4]

When it opened on 21 September 2014, it was the longest expressway in Vietnam.[1] The Yên Bái to Lao Cai section of the route was opened as a two-lane expressway, the section between Yen Bai and Hanoi being a four-lane dual carriageway.[1]

Remove ads

Route details

Lanes

  • Noi Bai–Yen Bai section: 160km long, with 4 lanes, 2 shoulder, maximum speed of 100km/h (from Km0+00 to Km123+080). There are 2 lanes in each direction, each lane is 3.75m wide and an emergency lane is 3m wide.
  • Yen Bai–Lào Cai section: 83km long, with 2 lanes, 2 shoulder, maximum speed of 80km/h. There are 1 lanes in each direction, each lane is 3.5m wide and an emergency lane is 2.5m wide. Every 8–10 km, there is a 1km-long 4-lane section for vehicles to pass each other.

Length

Total route length: 264 km

Speed

  • 2-lane section: Maximum: 80km/h, Minimum: 60km/h
  • 4-lane section: Maximum: 100km/h, Minimum: 60km/h (section Lào Cai City - Lào Cai international border gate Maximum: 90km/h, Minimum: 60km/h)

According to design, the maximum speed is 120 km/h. VEC will allow vehicles to run at a maximum speed of 120 km/h when ensuring safe conditions along the entire route.

Remove ads

List of interchanges and features

Thumb
Speed Information
More information No., Name ...


Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads