Line on the Delhi Metro system From Wikipedia, the free encyclopedia
Remove ads
The Green Line (Line 5) is a rapid transit metro line of the Delhi Metro in Delhi, India. The line consists of 24 stations covering a total length of 28.79 km (17.89 mi). It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[1]
This article needs additional citations for verification. (October 2017) |
It is almost an elevated line except for Kirti Nagar Metro Station which is At Grade and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in Red, Yellow and Blue Lines.
Remove ads
History
Summarize
Perspective
The line was opened in two stages, with the 15.1 km (9.38 mi) Inderlok – Mundka section opening on 3 April 2010[2] and the 3.5 km (2.17 mi) Kirti Nagar – Ashok Park Main branch line on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines, as it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.
On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km (6.95 mi) metro stretch comprises seven stations with four of them in Delhi and the remaining three in Bahadurgarh -- Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).[3]
Construction work of this extension began in 2013 and was completed by the second half of 2018, as part of the Phase III expansion. Prime Minister Narendra Modi inaugurated the Mundka – Bahadurgarh stretch via video conferencing on 24 June 2018.
In late October 2019, it was decided to construct steel platforms on the viaduct of Green Line between Punjabi Bagh and Shivaji Park stations that will provide a seamless interchange between Green Line and Pink Line.[4] Construction began in that year itself and the new halt platform of Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022, after multiple delays.[5]
The new halt platform of Green Line is connected by a Foot Over Bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres (696 ft) long. The new platforms are 155 metres (509 ft) in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[5]
Extension to Indraprastha
Under Phase-IV, six new lines covering a length of about 104 km (64.62 mi) were planned to be added to the metro network, out of which the extension of Green line would connect Inderlok with Indraprastha, at a length of 12.57 km (7.81 mi). The plans were finalized for implementation by the Government of Delhi in December 2018.[6]
A 12.37 km (7.69 mi) extension of Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[7][8][9]
Remove ads
Stations
Summarize
Perspective
Main Line
Branch Line
Remove ads
Train Info
Infrastructure
Green Line is equipped with Bombardier Cityflo 350 signalling.[2]
Rolling stock
The Green Line uses standard gauge trains manufactured by a consortium of Mitsubishi, Hyundai Rotem and Bharat Earth Movers (BEML). A total of 196 cars for the Green Line and the Violet Line were ordered for both 4-car configurations (46 trains) and 6-car configurations (2 trains). One train was manufactured in Changwon in South Korea and rest of the trains were manufactured at BEML's facility in Bangalore. Width of these trains is 2.9 meters as compared to 3.2 meters on broad gauge trains.[11]
Remove ads
Future extensions
- Delhi: within Delhi it will be extended to include the following.
- Central Vista Loop Line: As part of the Central Vista Redevelopment Project, this underground line with 4 stations, including the existing Central Secretariat metro station interchange of existing Yellow Line and Violet Line, by connecting the new government buildings coming up as part of the Central Vista Redevelopment project.[12]
- Rohtak: Green Line (Delhi Metro) will be extended from existing metro station in Bahadurgarh to Rohtak in the following phases:
- "Delhi Green Line Metro: Bahadurgarh to Asaudha extension": The Bahadurgarh (Brigadier Hoshiyar Singh metro station) to Asaudha extension to Asaudha railway station has been approved,[13] where it will interchange with Haryana Orbital Rail Corridor at Asaudha railway station. The budget for DPR was covered in FY 2023-24 budget Government of Haryana.[14]
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads