Top Qs
Timeline
Chat
Perspective

Line 2 (Shenzhen Metro)

Metro line in Shenzhen From Wikipedia, the free encyclopedia

Line 2 (Shenzhen Metro)
Remove ads

Shenzhen Metro Line 2 (formerly branded as Shekou line), runs West–East from Chiwan to Liantang. It opened on 28 December 2010. Line 2 merges into Line 8 at Liantang station, where trains continue service as Line 8 to Xiaomeisha station. Line 2's color is orange.[2][3]

Quick Facts Overview, Other name(s) ...
Remove ads
Thumb
Train exterior
Remove ads

History

First stage

The first section of Line 2 runs from Chiwan to Window of the World, it is 15.514 km (9.640 mi) long, and these 12 stations are all underground. This section opened on 28 December 2010.

Second stage

The second section runs from Window of the World to Xinxiu, it is 20.65 km (12.83 mi) long, and has 17 stations. The second stage of Line 2 opened on 28 June 2011.

Third stage

The third section runs from Xinxiu to Liantang, it is 3.82 km (2.37 mi) long, and has 3 stations. The third stage of Line 2 opened on 28 October 2020.

Timeline

More information Segment, Commencement ...
Remove ads

Service routes

Stations

More information Service routes, Station name ...
    Remove ads

    Rolling stock

    More information Type, Date of manufacture ...
    Remove ads

    Notes

    1. Out-of-station virtual transfer to Line 1 at Huaqiang Road. This transfer will be counted as two separate journeys requiring two fares.
    2. Out-of-station virtual transfer to Line 9 at Hongling South. This transfer will be counted as two separate journeys requiring two fares.

    References

    Loading related searches...

    Wikiwand - on

    Seamless Wikipedia browsing. On steroids.

    Remove ads