Top Qs
Timeline
Chat
Perspective

Line 2 (Sistema de Tren Eléctrico Urbano)

From Wikipedia, the free encyclopedia

Line 2 (Sistema de Tren Eléctrico Urbano)
Remove ads

Line 2 of the Guadalajara Urban Electric Train System is the second line built to optimise public transport by urban rail. It was constructed between January 1992 and June 1994. Its building cost was much higher than that of Line 1 because there was no existing infrastructure as was the case during Line 1's construction, and also because it involved the modification of drainage collectors in order to build new underground infrastructure.[2]

Line 2
Last extension July 1, 1994
Rolling stock TLG-88, TEG-90
Platforms 150 m (492 ft 2 in)
Quick Facts Overview, Owner ...

The inauguration of this line took place on July 1, 1994, and was headed by Governor of Jalisco Carlos Rivera Aceves and President Carlos Salinas de Gortari. Of the three existing lines, this is the shortest in the network and it is coloured green.

Remove ads

Line stations

More information Logo, Name ...
Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads