Top Qs
Timeline
Chat
Perspective
Line 11 (Suzhou Metro)
Metro line in Suzhou, Jiangsu, China From Wikipedia, the free encyclopedia
Remove ads
Line 11[6] is a rapid transit line of the Suzhou Metro system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023.[3][7][8] The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph).[9][10] Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.
Remove ads
Description
Running west-east, the line mainly serves the urban area of Kunshan, and connects it to Suzhou Industrial Park in the west and nearby Shanghai in the east via a transfer at Huaqiao station to Line 11 of Shanghai Metro.[1] The line is the first metro line in downtown Kunshan.[4]
Stations
Summarize
Perspective
Service routes
- Local service (L): Suzhou Xinqu Railway Station (Line 3) — Huaqiao
- Rapid Service (R): Gongqing — Huaqiao, eastern bound in the morning, and western bound in the night
Through service
Through service between Line 3 and Line 11 started on December 23, 2023.[13]
Remove ads
Rolling stock
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads