Top Qs
Timeline
Chat
Perspective

Ling Ao Nuclear Power Plant

Nuclear power plant in Guangdong, China From Wikipedia, the free encyclopedia

Remove ads

Ling Ao Nuclear Power Plant (岭澳核电站) is located on the Dapeng Peninsula in Longgang District, Shenzhen, Guangdong, China, about 60 km north of Hong Kong, 1 km north of Daya Bay Nuclear Power Plant. It is operated by China General Nuclear Power Group. The units on site are separated between phase I and phase II.

Quick Facts Official name, Country ...
Remove ads

The plant was one of China's largest energy projects of the latter 1990s.[5]:45

Remove ads

Reactors

Ling Ao phase I has two nuclear reactors, 950 MWe PWRs Ling Ao I-1 and I-2, based on the French 900 MWe three cooling loop design (M310), which started commercial operation in 2002 and 2003.[6] The planned investment sum for phase I was ca 4 billion USD.[7]

In a Phase II development two CPR-1000 reactors, Ling Ao II-1 and II-2 (alternatively, units 3 and 4), were constructed in conjunction with Areva, based on the French three cooling loop design. Ling Ao II-1, China’s first domestic CPR-1000 nuclear power plant, was first connected to the grid on 15 July 2010,[8] having started criticality testing on 11 June 2010.[9] It started commercial operations on 27 September 2010.[10] Ling Ao II-2 was synchronized to the grid on May 3, 2011, with commercial operation beginning on August 7, 2011.[11]

Remove ads

Reactor data

The Ling Ao Nuclear Power Plant consist of 4 operational reactors.[12]

More information Unit, Type ...
Remove ads

See also

References

Loading content...
Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads