The Nyon–St-Cergue–Morez Railway (NStCM), French: Chemin de fer Nyon–Saint-Cergue–Morez, is a narrow gauge railway in western Switzerland which nowadays operates between Nyon, on the northern shore of Lake Geneva and the French border at La Cure, the La Cure–Morez section having closed in 1958. The railway reaches a height of 1,228 metres (4,029 feet) above sea level at the Col de la Givrine and it is the highest in the Jura Mountains.

Thumb
Railcars on shed: ACMV/BBC Type Be4/4 205 in 'new livery' (left) alongside SWS/SAAS Type BDe4/4 231 ex-CJ No.606, photographed at Saint-Cergue.
Quick Facts Overview, Native name ...
Nyon–La Cure
0km / 0hour
Nyon
395 m
Gare souterraine
210 m
1.1 / 0:01
Les Plantaz
420 m
Depot
2.4 / 0:02
La Vuarpillière
463 m
3.0 / 0:03
L'Asse
466 m
Asse-Viaduct
74 m
3.6 / 0:06
Trélex dépôt
477 m
4.4 / 0:07
Trélex
501 m
Colline-Viaduct
110 m
6.4 / 0:12
Givrins
554 m
7.5 / 0:14
Genolier
562 m
8.5 / 0:15
Sus-Châtel
599 m
9.8 / 0:18
La Joy-Clinique
668 m
11.1 / 0:21
Le Muids
715 m
12.1 / 0:22
Bassins
756 m
Tunnel Bassins
116 m
13.9 / 0:26
Arzier
842 m
17.1 / 0:30
La Chèvrerie-Monterêt
970 m
19.1 / 0:34
St-Cergue
1047 m
Tunnel St-Cergue
99 m
20.3 / 0:38
St-Cergue Les Cheseaux
1103 m
22.1 / 0:41
Les Pralies
1176 m
23.3 / 0:43
La Givrine
1208 m
27.0 / 0:49
La Cure
1155 m
Swiss / French border
27,3
La Cure (F)
1152 m
29,5
Les Rousses
1110 m
Sous-les-Barres
940 m
Tunnel Sous-les-Barres
96 m
33,8
Gouland
895 m
Tunnel Turu
58 m
La Doye
Pont de la Bienne
Morez Ecole
38,2
Morez Ville
701 m
39,1
Morez SNCF
734 m
Remove ads

History

The line, built to 1,000 mm (3 ft 3+38 in) gauge, was opened in three sections, the first from Nyon, a town on the shores of Lake Geneva, to the Jura mountain resort village of Saint-Cergue on 12 July 1916, then to the French border at La Cure, opened on 18 August 1917. The third section, built by the French Company Chemins de fer électriques du Jura (CFEJ), taking the line over the border was opened to the French town of Morez on 7 March 1921 giving a total length of 39 km (24 mi). In effect, this small line linked the Swiss railways' main line from Geneva to Lausanne with that of the Chemins de fer de Paris à Lyon et à la Méditerranée (PLM) (from 1938 this was the SNCF). With the exception of the period from 1940 to 1948 this enabled direct services to operate on a daily basis, although wintertime conditions often made this a difficult feat. Because of its steep gradients the line was electrified from the outset at the unusual, if not unique, 2,200 Volts DC. The 12-kilometre (7.5 mi) French section from La Cure to Morez closed on 28 September 1958.

Remove ads

The line

Originally the line commenced outside the main station in Nyon and after passing below the Swiss Federal Railways main line it climbed steadily, steeply in places taking large curves to ease the gradient, to the mountain resort of St. Cergue. From here it runs alongside the road through the Col de la Givrine, with a summit of 1,232 m (4,042 ft). Above sea level, to the village of La Cure, nowadays its upper terminus. It was here the line crossed the French border and again running alongside the road, passing the village of Les Rousses it duly arrived in the streets of Morez. The line then descended steeply to terminate in front of the PLM station.

Remove ads

Locomotives and Rolling Stock

More information No., Type ...
  • all motor coaches are double cab
  • all driving trailers are single cab
  • B 341-342 are MU-wired for push-pull operation with Be4/4 201-205, BDe4/4 211 and Bt 301-305

Abbreviations

Modernisation

Summarize
Perspective

The earliest section to open, that in Switzerland, continued after the closure of the French section and in the 1980s was part of a modernisation programme. The overline line voltage was changed from 2,200 Volts DC to the more common 1,500 Volts DC[1] and automatic block signalling was installed. Work to modernise the infrastructure and implement the voltage change took place throughout 1984 and 1985. The St. Cergue–La Cure section was changed to the new, reduced voltage in mid-October 1985 and the Nyon–St. Cergue section followed on 5 December 1985.[1] As part of this modernisation, new rolling stock was purchased, and arrived starting in autumn 1985. These were new automotrice (powered driving railcars) and matching voitures pilote (driving trailers). During the transitional phase in the line voltage, the old cars were able to continue in service after the reduction in voltage, but at reduced speed. The old stock ran for the last time on 20 December 1985, and from 21 December all service was operated by the new trains.[1]

Plans were put forward in 1999 to extend the line some 2.5 km (1.6 mi) over the French border to the village of Les Rousses but this did not prove cost effective to the communities involved and was rejected. In 2004, the Nyon terminus was moved to a two platform underground station on the north side of the main line approached by escalators from the station underpass.

Remove ads

Preservation

The original “automotrice”, of which 7 were built, were heavy duty vehicles and could haul several trailer cars. Two of these have survived, restored to working order, at the Chemin de Fer de la Mure near Grenoble. Two other examples were sold to the same railway but have yet to be restored. Some trailer cars have also survived including No. B7 which has been restored at the Blonay–Chamby museum railway near Montreux and another example at the Chemin de Fer Voies Ferrees du Velay in Haute Loire. The vehicles carried a dark red livery.