Top Qs
Timeline
Chat
Perspective

Novosibirskenergo

From Wikipedia, the free encyclopedia

Remove ads

OJSC Novosibirskenergo (TGK-11; Russian: ОАО Новосибирскэнерго) was an electric power generation, transfer and distribution company located in Novosibirsk Oblast.[1]

Quick Facts Company type, Founded ...
Remove ads

Overview

As of 2007, the company has 6 electric power stations, with a total installed electric capacity of 2,977 MW. Most of them run on coal, gas or oil. The largest station is TPP-5, which had its first unit launched in 1985; it has a capacity of 1,200 MW. The company also runs the Novosibirsk Hydroelectric Station with an installed capacity of 455 MW. Its first unit was launched in 1957.[2]

Revenue in 2007 was RUB 21,875.00 million, while operating profit was RUB 2,819.00 million.[citation needed]

The company was created in 1993 as part of the privatization of Russia's energy system.[3] It has 14,067 employees.[citation needed] Its headquarters are located in the city Novosibirsk in Novosibirsk Oblast. The company is controlled by Mikhail Abyzov.[4]

The company stopped generating energy in 2011, with its power plants ending up with Sibeko.[5] Novosibirskenergo was liquidated in December 2015.[6]

Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads