Top Qs
Timeline
Chat
Perspective

Rayadurg–Tumkur section

Rail line in Andhra Pradesh, Karnataka From Wikipedia, the free encyclopedia

Remove ads

Rayadurg–Tumkur section is an ongoing broad-gauge railway line project in the Indian states of Andhra Pradesh and Karnataka. It connects Rayadurg in Andhra Pradesh with Tumkur in Karnataka.

Quick facts Overview, Status ...
Remove ads

History

The foundation stone for this project was laid in October 2011 with an outlay of 857.31 crores.[1]

Jurisdiction

This project falls under the jurisdiction of both Andhra Pradesh and Karnataka states with a distance of 94 km and 113 km. This line falls under the jurisdiction of Hubli railway division of the South Western Railway Zone.

Status

As of now 63 km of track is operational. There is a single daily passenger service from Tirupati to Kadiri Devarapalli.[2]

Route

This line passes through Kalyandurg, Kadiridevarapalli, Doddahalli, Pavagada, Madakasira, Medigeshi, Madhugiri, Koratagere Oorukere and ends at Tumkur.

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads