Top Qs
Timeline
Chat
Perspective
Sejong–Pocheon Expressway
Road in South Korea From Wikipedia, the free encyclopedia
Remove ads
The Sejong–Pocheon Expressway (Korean: 세종포천고속도로), is an expressway in South Korea, connecting Anseong to Guri, Seoul, Namyangju, Uijeongbu and Pocheon.
Construction on the Guri–Pocheon section was started on June 30, 2012, and finished on June 30, 2017.[2] It is a private investment project so the toll rates are cheaper than other expressways in South Korea. The highway operated is by the Seoul Northern Highway Corporation.
The Sejong–Guri section has been called Sejong–Seoul Expressway or 2nd Gyeongbu Expressway, and it is planned to reduce traffic congestion between Gyeongbu Expressway and Jungbu Expressway. The first section of Seongnam–Guri is Anseong–Guri section, was finished on April 25, 2017. The remaining sections between Anseong and Seongnam will be completed in 2022. The second section, Sejong–Anseong, will be started in 2020 and completed in 2025.
Currently the National Route 43, National Route 47 and Dongbu Expressway, which connects Pocheon and Seoul have many vehicles and traffic lights. This expressway has reduced the travel time between two cities from 1 hour 30 minutes to 40 minutes.
Remove ads
Main stopovers

Compositions
Lanes
- S. Anseong JCT - Soheul JCT: 6 (102.66 km)
- Soheul JCT - Sinbuk IC: 4 (14.14 km)
Tunnel
Remove ads
List of facilities
Summarize
Perspective
![]() | This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. (November 2021) |
- IC: Interchange, JCT: Junction, SA: Service Area, TG:Tollgate
Anseong ~ Pocheon
Soheul ~ Yangju section
This section is officially opened as the branch line of Sejong–Pocheon Expressway. However, it is guided to the Capital Region 2nd Ring Expressway.
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads