Siadar Wave Power Station

From Wikipedia, the free encyclopedia

Remove ads

The Siadar Wave Power Station (also known as Siadar Wave Energy Project or SWEP) was a proposed 4 MW wave farm 400 metres (1,300 ft) off the shore of Siadar Bay, in Lewis, Scotland.[1] The £30 million project, was to be built by Wavegen, received Scottish Government approval on 22 January 2009. Originally, the project was developed in cooperation with npower Renewables. However, in August 2011, npower Renewables left the project.[2] In 2012 project was cancelled.[3]

Quick Facts Official name, Country ...
Remove ads

The wave station was proposed to be based on oscillating water column technology.[4] A 200-metre (660 ft) causeway will be constructed, and a breakwater with 10 concrete caissons, containing 36 to 40 Wells turbines, placed on the seabed.[5]