Top Qs
Timeline
Chat
Perspective

Tabriz–Ankara pipeline

Natural gas pipeline in Iran and Turkey From Wikipedia, the free encyclopedia

Remove ads

The Tabriz–Ankara pipeline is a 2,577-kilometre (1,601 mi) long natural gas pipeline, which runs from Tabriz in north-west Iran to Ankara in Turkey.

Quick Facts Location, Country ...
Remove ads

History

The construction of pipeline started in 1996 after signing a gas deal between Turkish and Iranian governments. The gas deal was signed on 30 August 1996. The pipeline was commissioned in July 2001.

The Iran-Turkey pipeline has allegedly been blown up several times by PKK fighters.[1] In January 2008 gas supplies were stopped because of cut-off gas supplies from Turkmenistan.[2] The supply was cut off again in February 2008 because of bad weather conditions.[3]

Technical features

The Turkish section, operated by BOTAŞ, cost US$600 million. The pipeline capacity is 14 bcm per year:[4] Turkish normally imports about 11 billion cubic meters of gas a year through the pipeline.[2] Just before Ankara it is linked to Blue Stream.[5]

Contracts

Negotiations are in progress to renew the current 25 year contract,[6] for nearly 10 bcm per year,[7] which expires end-2025 according to the Middle East Economic Survey[8] (or end-July 2026 according to the Oxford Institute for Energy Studies[9]:22).


See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads