Top Qs
Timeline
Chat
Perspective

Tokwe Mukosi Dam

Dam in close to Ngundu, Masvingo Province From Wikipedia, the free encyclopedia

Remove ads

The Tokwe Mukosi Dam or Tugwi Mukosi Dam[1] is a concrete-face rock-fill dam on the Tokwe River, just downstream of its confluence with the Mukosi River, about 72 kilometres (45 mi) south of Masvingo in Masvingo Province, Zimbabwe.[2] It is 90.3 metres (296 ft) tall and creates a 1,750,000,000 m3 (1,420,000 acre⋅ft) reservoir, the largest inland dam in the country. The associated hydroelectric power station has a 12 megawatts (16,000 hp) installed capacity.[3]

Quick facts Official name, Country ...

Construction on the dam began in June 1998 but stalled in 2008. Salini Impregilo began to finish the dam in 2011. Heavy flooding in February 2014 caused a partial failure on 4 February, on the downstream face of the dam.[4][5] By late February the dam had not been fully breached but the unplanned rising reservoir behind the dam caused evacuations upstream.[6] Both upstream and downstream, over 20,000 people were evacuated.[7] Construction of the dam was suspended in June 2014 due to a lack of funding.[8][9] In May 2016 the government released $35 million to Salini Impregilio[10] to enable the Italian contractor resume construction work that stopped two years ago owing to payment problems.[11] The Dam was eventually completed in December 2016 and commissioned in May 2017.[12]

Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads