Top Qs
Timeline
Chat
Perspective

Ürümqi Metro

Metro system of Ürümqi, Xinjiang, China From Wikipedia, the free encyclopedia

Ürümqi Metro
Remove ads

The Ürümqi Metro or Ürümqi Subway is a rapid transit system in operation in Ürümqi, capital of the Xinjiang Autonomous Region in China. It is the 35th rapid transit system to be put into operation on the Chinese mainland and the second in northwest China. At only 33.4 km (20.8 mi), the Ürümqi Metro is currently the smallest metro system in terms of length in Mainland China.

Quick Facts Overview, Locale ...
Quick Facts Chinese name, Simplified Chinese ...

The Ürümqi Metro has submitted plans for two lines, Line 1 and Line 2, with an estimated cost of 31.24 billion yuan.[4]

Remove ads

Lines

Summarize
Perspective

Line 1

Thumb
Concourse of Erdaoqiao Station

Line 1 runs from Ürümqi Tianshan International Airport through downtown Ürümqi and ends at Santunbei station. It has a total length of 27.615 km[5] and 21 stations.[5][6] It is fully underground.[7]

Line 1 started construction on 20 March 2014. The northern section of the line was opened on 25 October 2018. The southern section of the line was opened on 28 June 2019.[5]

Thumb
More information Line, Terminals ...

Airport MRT

The Airport MRT was opened on 17 April 2025, and runs in Ürümqi Tianshan International Airport only.[8][9] It consists of two stations, namely International Airport and International Airport North. This is treated as a shuttle, connecting the closed southern terminal and the northern terminal. They planned for an east terminal extension, but this was cancelled.

More information Station name, Transfer ...

Light grey= Unplanned \ Cancelled \ U\C

Notes

  1. The South Terminal was closed on April 17th 2025 to make way for the new North Terminal
Remove ads

Under construction

Thumb
Urumqi Metro Map with planned expansions shown.

Line 2

Ürümqi metro line 2 is under construction. The line will have 16 stations from Yan'an Road to Huashan Street.[10] Line 2 will serve Ürümqi railway station. The first stretch will open from Huashan Street upto Nanmen in July 2025. The rest of the part will open in 2027. The following is the route:

Yan’an Road – Xiangyangpo – Dawan – Heijiashan – Xingfu Road Middle – Xingfu Road West – Nanmen – Zhongqiao – Nianzigou – Nanliangpo – Xinjiang Agricultural University – Maliaodi – Pingchuan Road – Jiujiawan – Urumqi Railway Station – Huashan Street.

The color of this line is green.

Phase 2 of line 2 is currently in early consideration on planning. A 5.33 km section of phase 2 is completed in 17 April 2025 as Airport MRT.

Remove ads

Future Development

Lines 3, 4, 5, 6, 7, 8, 9 and 10 are under planning.

Thumb
Network planning map

Network Map

Thumb

See also

Other Transport in Ürümqi

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads