Top Qs
Timeline
Chat
Perspective

Wongwian Yai station

Railway station in Bangkok, Thailand From Wikipedia, the free encyclopedia

Wongwian Yai stationmap
Remove ads

Wongwian Yai station (Thai: สถานีวงเวียนใหญ่, pronounced [sā.tʰǎː.nīː wōŋ.wīa̯n jàj]) is the name of a cluster of railway and rapid transit stations in Bangkok, near the Wongwian Yai traffic circle. It includes the existing terminus of the State Railway of Thailand's Maeklong Railway and an elevated station on the BTS Skytrain's Silom Line, as well as an under-construction underground station of the MRT Purple Line, planned to open in 2028, and a planned station of the SRT Dark Red Line, which will replace the old railway station.

Quick facts General information, Location ...
Thumb
Wongwian Yai Station Traditional sign
Quick facts วงเวียนใหญ่PP25 Wongwian Yai, General information ...
Quick facts General information, Location ...

The Wongwian Yai (SRT) station is a railway station located in Bang Yi Ruea subdistrict, Thon Buri district. It is a class 1 railway station and is the Bangkok terminus of the Maeklong Railway Mahachai Line. Currently, 34 rail services operate at the station.[1][2] It is located closer to the titular Wongwian Yai roundabout than the Silom Line station. Wongwian Yai is the main station used for rail passenger traffic from Samut Sakhon and Samut Songkhram provinces.[3]

The Silom Line station is on Krung Thon Buri Road to the west of Taksin intersection in Khlong San District, Bangkok. It was opened on 15 May 2009, together with Krung Thon Buri station on the 2.2 km (1.4 mi) being the first two rapid transit stations in Thonburi, the west bank of the Chao Phraya River.

Remove ads

History

The station opened on 29 December 1904 during the reign of King Chulalongkorn, as part of the Pak Khlong San–Mahachai railway operated by the Tachin Railway Ltd.[4] On 24 November 1959, Prime Minister Sarit Thanarat suggested to the cabinet that the Pak Khlong San–Wongwian Yai section be closed in order to accommodate the increase in road traffic.[5] The station became the line's terminus following the closure of Pak Khlong San railway station, on 1 January 1961, with the Pak Khlong San–Wongwian Yai section converted into Charoen Rat Road.[6]

On 22 March 2019, a train collided with the buffer stop at Wongwian Yai station due to an air brake failure. Two people were injured.[7]

Remove ads

Station layout

BTS station

U3
Platform
Side platform, doors will open on the left
Platform 4 Silom Line toward National Stadium (Krung Thon Buri)
Platform 3 Silom Line toward Bang Wa (Pho Nimit)
Side platform, doors will open on the left
U2
ticket sales class
ticket sales floor Exit 1–4, Passenger Service Center
Ticket Office, Ticket Machine, Shop
G
Street level
- Bus Stop
Wongwian Yai Market, Wongwian Yai Railway Station
Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads