Construction of Mount Rushmore
Construction of Mount Rushmore's memorialThe construction of Mount Rushmore National Memorial began on October 4, 1927, and took 14 years to complete. The sculptor of the memorial was Gutzon Borglum, the son of Danish immigrants. He chose the two most famous presidents, George Washington and Abraham Lincoln, and chose Thomas Jefferson because of the 1803 Louisiana Purchase. Theodore Roosevelt was suggested by United States president Calvin Coolidge. Borglum's original design was intended to go down to their waists, but aside from the Washington sculpture time constraints and funding only provided for their heads.
Read article
Top Questions
AI generatedMore questions
Nearby Places

Keystone, South Dakota
City in South Dakota, United States

Mount Rushmore
Mountain in South Dakota with sculptures of four U.S. presidents

Horse Thief Lake
Lake in the state of South Dakota, United States

Lincoln Borglum Museum
Museum in the Mount Rushmore National Memorial with two 125-seat theaters
Etta, South Dakota
Ghost town in South Dakota, United States
Grizzly Bear Creek (South Dakota)
Stream in South Dakota, U.S.

Keystone School (Keystone, South Dakota)
United States historic place

Mount Rushmore Fireworks Celebration