Map Graph

Umiray–Angat Transbasin Project

Bridge

The Umiray–Angat Transbasin Project (UATP) is an expansion project of the Metropolitan Waterworks and Sewerage System (MWSS) for the supply of the Angat Dam reservoir. The 13-kilometer-long (8.1 mi) 4.30-meter (14.1 ft) diameter tunnel-aqueduct system diverts waters from the Umiray River east of the Angat Basin. 20–30% of the water that is consumed in Metro Manila and its outlying regions is supplied by the Umiray Basin.

Read article
Top Questions
AI generated

List the top facts about Umiray–Angat Transbasin Project

Summarize this article

What is the single most intriguing fact about Umiray–Angat Transbasin Project?

Are there any controversies surrounding Umiray–Angat Transbasin Project?

More questions