Map Graph

Yangyang Pumped Storage Power Station

Dam in Yangyang

The Yangyang Pumped Storage Power Station uses the water of the Namdae-Chun River to operate a 1,000-megawatt (1,300,000 hp) pumped storage hydroelectric power scheme, about 10 kilometres (6.2 mi) west of Yangyang in Gangwon Province, South Korea. The lower reservoir is created by the Yangyang Dam on the Namdae and the upper reservoir by the Inje Dam is located 937 metres (3,074 ft) above the power plant. Construction on the power plant began in 1996 and it was completed and dedicated on September 13, 2006. It is operated by Korean Midland Power Co., a subsidiary of Korea Electric Power Company and was completed at a cost of ₩1.1 trillion won. The first generator was operational on February 23, 2006 and the last August 10, 2006.

Read article
Top Questions
AI generated

List the top facts about Yangyang Pumped Storage Power Station

Summarize this article

What is the single most intriguing fact about Yangyang Pumped Storage Power Station?

Are there any controversies surrounding Yangyang Pumped Storage Power Station?

More questions