Anand Nagar (Pune) metro station
Pune Metro's Aqua Line metro station From Wikipedia, the free encyclopedia
Pune Metro's Aqua Line metro station From Wikipedia, the free encyclopedia
Anand Nagar is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed.[1] From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College.[2] The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic.[3] Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.[4]
Anand Nagar | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pune Metro station | |||||||||||
General information | |||||||||||
Location | Rambaug Colony, Kothrud, Pune, Maharashtra 411038 | ||||||||||
Coordinates | 18.50963°N 73.81408°E | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Operated by | Pune Metro | ||||||||||
Line(s) | Aqua Line | ||||||||||
Platforms | Side platform Platform-1 → Ramwadi Platform-2 → Vanaz | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | AND | ||||||||||
History | |||||||||||
Opened | 6 March 2022 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
Anand Nagar track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Ramwadi Next Station: Ideal Colony | |
Platform 2 Westbound |
Towards ← Vanaz | |
Side platform | Doors will open on the left | ||
L3 | ||
This section is empty. You can help by adding to it. (August 2023) |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.