Arriva Rail North
Former British train operating company / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Arriva Rail North?
Summarize this article for a 10 year old
Arriva Rail North, branded as Northern by Arriva (legal name Arriva Rail North Limited[1]), was a train operating company in Northern England which began operating the Northern franchise on 1 April 2016 and inherited units from the previous operator Northern Rail. A subsidiary of Arriva UK Trains, Northern was the largest train franchise in the United Kingdom in terms of the size of the network and the number of weekly services run. Its trains called at 528 stations, about a quarter of all stations in the country; of these stations 476 were operated by Northern.[2] On 1 March 2020, Arriva Rail North Limited ceased to operate and all operations were handed to HM Government's Operator of Last Resort.
Overview | |
---|---|
Franchise(s) | Northern 1 April 2016 – 29 February 2020 |
Main region(s) | North West North East Yorkshire and the Humber |
Other region(s) | East Midlands Staffordshire |
Fleet size | 386 units[nb 1] |
Stations called at | 528 |
Stations operated | 476 |
Parent company | Arriva |
Predecessor | Northern Rail |
Successor | Northern Trains |
Other | |
Website | www.northernrailway.co.uk |
During the preceding Northern Rail franchise passenger numbers increased from 73 million to 97 million between 2004 and 2016 and as a result the new franchise was tendered on a growth basis, allowing for a £500 million investment in 101 new-built trains: the diesel Class 195 and electric Class 331.[3] Introduced into service in July 2019,[4] these were the first new-build trains for the Northern franchise since the introduction of the Class 333 in 2001, with further orders possible if the new units encouraged passenger growth and improved passenger satisfaction.[5] The new rolling stock allowed for the first Pacer trains to be retired in August 2019.[6]
Since the franchise began in April 2016, it had been beset by worsening punctuality,[7][8] perceived poor customer service,[9] frequent industrial action by staff,[10] and delays in introducing new rolling stock.[11] The franchise was badly affected by the May 2018 timetable fallout and punctuality struggled to recover. The franchise was scheduled to run until 2025 and had an option for an additional year, which was dependent on performance.
The future of the franchise was first reviewed by the Department for Transport (DfT) in July 2019 deeming frequent weekend cancellations due to insufficient staff to be "unacceptable".[12][13][14] It also voiced concerns about declining passenger numbers despite a 10% increase in timetabled services since the beginning of the franchise in 2016,[15] and an unplanned subsidy increase from £286 million to £404 million following the May 2018 timetable fallout.[16][17]
Conversely, Arriva contended that there had been "collective system inability",[18] citing Network Rail's inadequate timetabling to absorb delays and the DfT's unwillingness to proceed with improving infrastructure which were part of the Northern franchise bid prospectus in 2014,[19] such as two new "through" platforms at Manchester Piccadilly; these would have eased congestion through the Castlefield corridor[nb 2] and enabled the planned increase in services over the course of the franchise.[20]
On 29 January 2020, it was announced that the Northern franchise would end early on 1 March 2020 - marking the first time a franchise has been removed from a train operating company due to poor performance since Connex South Eastern in 2003. From this date onwards, the franchise became directly operated by the DfT under the brand name Northern Trains with an objective to "stabilise performance and restore reliability for passengers".[21][22]