Bund Garden metro station
Pune Metro's Aqua Line metro station From Wikipedia, the free encyclopedia
Pune Metro's Aqua Line metro station From Wikipedia, the free encyclopedia
Bund Garden is an elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It was opened on 6 March 2024 as an extension of Pune Metro Phase I.[1] The trial run from this station till Ramwadi was started in September 2023.[2] Aqua Line operates between Vanaz and Ramwadi stations.[3][4] It is located in the vicinity of an upmarket residential area with restaurants, schools and malls. The design of the station facade is inspired by elements of nature.[5]
Bund Garden | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pune Metro station | |||||||||||
General information | |||||||||||
Location | Bund Garden, Pune, Maharashtra 411001 | ||||||||||
Coordinates | 18°32′25″N 73°53′00″E | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Operated by | Pune Metro | ||||||||||
Line(s) | Aqua Line | ||||||||||
Platforms | Side platform Platform-1 → Ramwadi Platform-2 → Vanaz | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | BUN | ||||||||||
History | |||||||||||
Opened | 6 March 2024 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
Bund Garden track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Ramwadi Next Station: Yerwada | |
Platform 2 Westbound |
Towards ← Vanaz Next Station: Ruby Hall Clinic | |
Side platform | Doors will open on the left | ||
L3 | ||
This section is empty. You can help by adding to it. (March 2024) |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.