Loading AI tools
Municipal building in Ellesmere Port, Cheshire, England From Wikipedia, the free encyclopedia
Ellesmere Port Council Offices is a municipal building in Civic Way in Ellesmere Port, a town in Cheshire, in England. The building served as the headquarters of Ellesmere Port and Neston Borough Council but is now disused.
Ellesmere Port Council Offices | |
---|---|
Location | Civic Way, Ellesmere Port |
Coordinates | 53.2768°N 2.9041°W |
Built | 1969 |
Architectural style(s) | Modern style |
Following significant population growth, largely associated with the shipping industry, a local board of health was established in the area in 1872.[1] The local board of health was replaced by Wirral Rural District Council in 1894 and by Ellesmere Port and Whitby Urban District Council in 1902.[2] The new council initially established offices at Bank Buildings in Station Street,[3] before opening dedicated offices in 1908.[4][5] The council then moved to the former home of the Grace family, Whitby Hall, in 1931.[6]
After the Second World War, a memorial, in the form of an irregular monolith of stone bearing by a plaque commemorating the lives of veterans involved in the Normandy landings, was unveiled to the west of the council offices at the corner of Stanney Lane and Whitby Road.[7][8]
The area became a municipal borough in 1955 and, in that context, the council found that the Whitby Hall was inadequate and decided to commission a new civic complex. The site they selected was open land on the north side of Stanney Lane.[9] The council offices were the final phase of the development of the new civic complex in the new town centre, following the opening of the Civic Hall in 1955, and a library in 1962.[10] The new five-storey building was designed under the supervision of the borough engineer and surveyor, Howard Wilson,[11] in the modern style, built in concrete, glass and brick and was completed in 1969. The main frontage was faced with alternating bands of concrete cladding and steel-framed glass and there were brick-clad staircase towers at centre and ends of the structure.[12]
The building continued to serve as the local administrative headquarters after the area became part of the new Borough of Ellesmere Port and Neston in 1974.[13] However, council meetings continued to be held at Whitby Hall until the early 1990s, when the council offices were extended. The additions including a new hexagonal shaped structure, containing a purpose-built council chamber, and an underground bunker, intended for use in the event of a nuclear attack.[14] In 2009, the borough became part of Cheshire West and Chester.[15]
In 2005, a new civic square was established to the east of the council offices. The centrepiece of the civic square was a new war memorial, in the form of a celtic cross on a cruciform base commemorating the lives of all local service personnel who had died in military conflict, which was unveiled on 11 November 2005.[16][17]
The new council continued to use the building to deliver services until May 2022, when it moved to a new building in the town, The Portal.[18] Demolition of the building was approved, but was delayed until 2024 due to the need to relocate mobile phone masts from the roof.[19][20][21]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.