The European High-Performance Computing Joint Undertaking (EuroHPC JU) is a public-private partnership in high-performance computing (HPC), enabling the pooling of European Union–level resources with the resources of participating EU Member States and participating associated states of the Horizon Europe and Digital Europe programmes, as well as private stakeholders. The Joint Undertaking has the twin stated aims of developing a pan-European supercomputing infrastructure, and supporting research and innovation activities. Located in Luxembourg City, Luxembourg, the Joint Undertaking started operating in November 2018 under the control of the European Commission and became autonomous in 2020.
EuroHPC JU | |
Joint Undertaking overview | |
---|---|
Formed | 6 November 2018 (began operations) |
Headquarters | Drosbach Building 12E rue Guillaume Kroll Gasperich, Luxembourg City, L-1882 Luxembourg 49.579640°N 6.111510°E |
Joint Undertaking executive |
|
Key document | |
Website | eurohpc-ju |
In June 2016, EU Member State leaders, meeting in the European Council called for greater coordination of EU efforts on high-performance computing as part of the EU's wider Digital Single Market strategy.[1] The European Declaration on High-Performance Computing was launched in Rome in March 2017, initially signed by seven EU Member States (France, Germany, Italy, Luxembourg, the Netherlands, Portugal and Spain) committed to upgrading European computing power.[2][3] In June 2018, the Council of the EU endorsed the European Commission’s proposal to establish the EuroHPC Joint Undertaking.[4] On 3 July 2018, the European Parliament voted in favour of the Commission’s proposal to create a European High Performance Computing Joint Undertaking.[4] The proposal was formally adopted by the Council of the European Union on 28 September 2018.[4]
The Executive Director was appointed on 15 May 2020 and the Joint Undertaking became autonomous from the European Commission on 23 September 2020.[5]
The EuroHPC Joint Undertaking was reviewed by means of Council Regulation (EU) 2021/1173.[6]
The EuroHPC Joint Undertaking is jointly funded by its members with a budget of around €7 billion for the period 2021-2027.
Most of this funding comes from the current EU long-term budget, the Multiannual Financial Framework (MFF 2021-2027) with a contribution of €3 billion, distributed as follows:
The EU contribution is matched by a similar amount from the participating countries. Additionally, private members are contributing an amount of €900 million.[7]
The Joint Undertaking provides financial support in the form of procurement or research and innovation grants to participants following open and competitive calls.
The EuroHPC JU has the twin objectives of;
In June 2019, the EuroHPC JU governing board selected 8 sites for supercomputing centres located in 8 different EU Member States to host the new high-performance computing machines. The hosting sites will be located in Sofia (Bulgaria), Ostrava (Czech Republic), Kajaani (Finland), Bologna (Italy), Bissen (Luxembourg), Minho (Portugal), Maribor (Slovenia), and Barcelona (Spain). 3 of the 8 sites will host precursor to exascale machines (capable of executing more than 150 Petaflops, or 150 million billion calculations per second) that will be in the global top 5 supercomputers, and 5 petascale machines (capable of executing at least 4 Petaflops, or 4 million billion operations per second).[10][11][12]
In 2022, the EuroHPC governing board selected a further 5 sites to host a new fleet of EuroHPC supercomputers, including the first European exascale supercomputer to be located in Germany. [13]
KAROLINA was installed in 2021 at IT4Innovations National Supercomputing Center in the Czech Republic. In the TOP500 list, which evaluates supercomputers in terms of their performance, it ranked 69th worldwide, 19th in Europe, and in the Green500 list of the most energy-efficient supercomputers, it even ranked 8th in 2021. The HPC system supplied by Hewlett Packard Enterprise is designed to respond coherently to the needs of its user communities, addressing complex scientific and industrial challenges, including standard numerical simulations, demanding data analysis, and artificial intelligence applications.[14]
"Discoverer", the EuroHPC supercomputer located in Bulgaria, was the third launched under the program on October 21, 2021. It is located on the territory of the Bulgarian Science and Technology Park "Sofia Tech Park" in Sofia, Bulgaria. The cost is co-financed by Bulgaria and EuroHPC JU with a joint investment of € 11.5 million completed by Atos. Discoverer has a stable performance of 4.5 petaflops and a peak performance of 6 petaflops.[15][16][17][18][19][20]
The Slovenian "Vega" was the first of the EuroHPC JU supercomputers to be launched on 20 April 2021. The system, built by Atos, is located at the Institute of Information Science Maribor (IZUM) in Maribor, Slovenia. The Vega supercomputer was jointly financed by EuroHPC JU and the Institute of Information Science Maribor (IZUM) to the sum of €17.2 million euros. Vega has a stable performance of 6.9 petaflops and a peak performance of 10.1 petaflops.[21][22]
"Meluxina", Luxembourg's supercomputer, was the second to be launched under the programme on 7 June 2021. Located at the LuxProvide data centre in Bissen, Luxembourg, the €30.4 million euros system was completed by Atos, with the Luxembourg government paying for two thirds of the associated costs, and the European Commission contributing the rest. Meluxina has a stable performance of 10 petaflops and a peak performance of 15 petaflops. The system is named after Melusine — a figure of Luxembourg and European folklore.[23][24][21][25]
The LUMI supercomputer is located at CSC in Kajaani, Finland. The HPE Cray EX supercomputer was supplied by Hewlett Packard Enterprise (HPE),[26] with joint funding by EuroHPC and the LUMI Consortium.[27] As of mid-2022, the LUMI-C partition is operational, with the LUMI-G partition expected to become operational by the end of 2022. With a measured High Performance Linpack (HPL) performance of 151,9 petaflops, LUMI ranked 3rd on the June 2022 edition of the TOP500 list of the most powerful supercomputers.[28] Once fully operational, the system will have a theoretical peak performance of 550 petaflops. [29][30]
Located in the Technopole of Bologna, in Bologna, Italy, Leonardo is a pre-exascale supercomputer which was installed in 2022. It is supplied by ATOS, based on a BullSequana XH2000 supercomputer and hosted by CINECA. Once fully operational, it is expected to be capable of executing over 250 petaflops.[31]
MareNostrum 5 will be located at the Barcelona Supercomputing Center in Barcelona, Spain. In 2022 it was announced that the system will be built by Atos. Once operational, MareNostrum 5 will be a top-of-the-range supercomputer, with an expected peak performance of 314 Petaflops. [32]
In 2022, the EuroHPC Joint Undertaking announced a further five supercomputers coming soon to five European countries:
In 2023, the EuroHPC JU announced a further two supercomputers:
The EuroHPC Joint Undertaking is composed of public and private members.
As of July 2022, public members of the Joint Undertaking include, the European Union (represented by the European Commission), 27 of the 27 EU Member States (Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain and Sweden), and six non-EU associated states of the EU's Horizon 2020 programme ( Israel, North Macedonia, Norway, Montenegro, Serbia, and Turkey).[35][36]
Other EU Member States or countries associated to Horizon 2020 are able to become members, provided that they accept the Statutes and financially contribute to the achievement of the objectives of the Joint Undertaking.[37]
The United Kingdom lost its observer status following its departure from the EU on 31 January 2020.[38]
The Joint Undertaking's private members include the European Technology Platform for High Performance Computing (ETP4HPC), the European Quantum Industry Consortium (QuIC), and the Big Data Value (BDVA) associations. Any legal entity established in a Member State or country associated to Horizon 2020 that supports research and innovation may apply to become a private member of the Joint Undertaking.[37]
There are three bodies in the EuroHPC Joint Undertaking:
The governing board is composed of representatives of the EU and participating states.[39] The European Commission and each participating state appoint one representative in the Governing Board.[39] Each representative may be accompanied by one expert.[39] The EU holds 50% of the voting rights through the European Commission representative.[39] The rest of the voting rights are distributed among the participating states according to the following lines;
The industrial and scientific advisory board consists of two Groups which provide independent advice to the Governing Board;
The executive director is the chief executive responsible for day-to-day management of the Joint Undertaking. The position is currently held by Anders Dam Jensen.[39]
The EuroHPC Joint Undertaking is headquartered in the Drosbach Building, used by the European Commission, in the Luxembourg City quarter of Gasperich, Luxembourg.[40]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.