Großwelzheim Nuclear Power Plant
Nuclear power plant in Germany From Wikipedia, the free encyclopedia
Nuclear power plant in Germany From Wikipedia, the free encyclopedia
Großwelzheim Nuclear Power Plant, (German: Kernkraftwerk Großwelzheim, HDR), was an experimental nuclear power plant consisting of one 25 MW reactor in Großwelzheim, a district of Karlstein am Main.
Großwelzheim Nuclear Power Plant | |
---|---|
Country | Germany |
Location | Karlstein am Main, Bavaria |
Coordinates | 50°3′29″N 8°59′13″E |
Status | Decommissioned |
Construction began | January 1, 1965 |
Commission date | July 17, 1961 |
Decommission date | April 20, 1971 |
Owner(s) | Heißdampfreaktor-Betriebsgesellschaft mbH |
Nuclear power station | |
Reactor type | Boiling water reactor |
Thermal capacity | 100 MWt |
Power generation | |
Units decommissioned | 1 x 25 MWe |
Annual net output | 6.2 GWh (in 1971) |
The prototype boiling water reactor, designed to produce superheated steam was under construction from 1965 to 1969, and was first connected to the power grid on October 14, 1969. The reactor could not be run at full capacity due to structural defects in the fuel elements.[1] Because of this, the reactor was switched off about a year and a half later on April 20, 1971.[2]
After the decommissioning in 1983, the plant was used for reactor safety tests until dismantling was completed in 1998.[3]
The site also included the Kahl Nuclear Power Plant, the first nuclear reactor to be built in Germany, as well as the first to be shut down. This makes the site the first in Germany where two reactors have been dismantled.
When the community of Karlstein am Main was created in 1975, an atomic symbol was included in the municipal coat of arms, due to the two reactors present in the newly formed town.
Großwelzheim Nuclear Power Plant had one Reactor:[2]
Reactor | Reactor Type | Net Capacity | Gross Capacity | Construction Start | First Grid Connection | Commercial Operation Start | Permanent Shutdown Date |
---|---|---|---|---|---|---|---|
HDR Großwelzheim | Prototype Boiling Water Reactor | 23 MW | 25 MW | Jan. 1, 1965 | Oct. 14, 1969 | Aug. 2, 1970 | April 20, 1971 |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.