![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/d/df/M8_Kozyata%25C4%259F%25C4%25B1_Metro_1.jpg/640px-M8_Kozyata%25C4%259F%25C4%25B1_Metro_1.jpg&w=640&q=50)
Kozyatağı (Istanbul Metro)
Station of the Istanbul Metro / From Wikipedia, the free encyclopedia
Kozyatağı (branded as Pegasus Kozyatağı for sponsorship reasons) is an underground transfer station for the M4 line and the M8 line of the Istanbul Metro.[2] Located under beneath the D.100 state highway in Kozyatağı, it was opened on 17 August 2012 for the M4[3] and on 6 January 2023 for the M8 line.[4]
Quick Facts General information, Location ...
Kozyatağı | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Istanbul Metro rapid transit station | ||||||||||||||||
![]() M8 platform | ||||||||||||||||
General information | ||||||||||||||||
Location | E-5 Yanyolu, İçerenköy Mah., 34752 Kadıköy | |||||||||||||||
Coordinates | 40.9745°N 29.1000°E / 40.9745; 29.1000 | |||||||||||||||
Owned by | Istanbul Metropolitan Municipality | |||||||||||||||
Operated by | Istanbul Metro | |||||||||||||||
Line(s) | ![]() ![]() | |||||||||||||||
Platforms | 2 island platform | |||||||||||||||
Tracks | 4 | |||||||||||||||
Connections | ![]() ![]() | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Parking | Yes | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | M4: 17 August 2012; 11 years ago (2012-08-17) M8: 6 January 2023; 17 months ago (2023-01-06) | |||||||||||||||
Electrified | 1,500 V DC Overhead line | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Close