![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/0/03/Construction_Site_of_Line_7%252C_Tongyuanlu_South_Station.jpg/640px-Construction_Site_of_Line_7%252C_Tongyuanlu_South_Station.jpg&w=640&q=50)
Line 7 (Suzhou Rail Transit)
Future rail line in Jiangsu, China / From Wikipedia, the free encyclopedia
Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]
Quick Facts Overview, Status ...
Line 7 | |
---|---|
![]() | |
![]() Line 7 Under Construction at Tongyuanlu South station | |
Overview | |
Status | Under construction (Hongzhuang to Muli is operational as the branch of Line 4) |
Owner | Suzhou Rail Transit Co., Ltd |
Termini |
|
Stations | 33 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Technical | |
Line length | 29.6 km |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Close
According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as part of Line 7.[2] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.
It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]