Moorabool Wind Farm is an operational wind farm located 25 km southeast of Ballarat in Victoria, Australia. The wind farm is in two parts: the northern part has 50 turbines, and the southern part has 54 turbines.[1] By December 2021, all 104 turbines had been put into place. The turbines each measure 169 m to the tip of the blade.
Moorabool Wind Farm | |
---|---|
Country |
|
Location | |
Coordinates | 37°42′S 144°12′E |
Status | Operational |
Construction began |
|
Commission date | 2022 |
Owner(s) | |
Wind farm | |
Type | |
Power generation | |
Nameplate capacity |
|
External links | |
Website | mooraboolwindfarm |
The farm is being developed by Goldwind Australia.[2] When operational, it will be one of three wind farms in Moorabool Shire. The others are Yaloak South Wind Farm and Lal Lal Wind Farm.[3]
When fully operational, the farm will produce up to 312MW of electricity, enough energy to power approximately 228,000 Victorian homes.[4]
The components for the southern section were delivered from the Port of Geelong in a total of 594 oversized loads at a rate of approximately 33 per week from September 2019 to February 2020.[5]
The wind farm commenced partial operation in late 2020. Commissioning was completed in 2022.[2]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.