Loading AI tools
Class of coaches operated by the Philippine National Railways From Wikipedia, the free encyclopedia
The PNR 8300 class, also referred to as INKA coaches, is a class of locomotive-hauled passenger coaches operated by the Philippine National Railways since 2021.[1][2]
PNR 8300 class | |
---|---|
Stock type | Passenger coach |
In service | 2021–present |
Manufacturer | Industri Kereta Api |
Built at | Madiun, Indonesia |
Family name | INKA K3 coach |
Replaced | KiHa 350 (for Bicol Commuter Services) |
Constructed | 2019–2020 |
Entered service | January 28, 2021 |
Number built | 15 vehicles (3 sets) |
Number in service | 10 vehicles (2 sets) |
Formation | 5 coaches per trainset / 4 coaches per trainset (Bicol Commuter) |
Fleet numbers | 8301–8303 |
Capacity | 266 per carriage 1,330 total passengers |
Operators | Philippine National Railways |
Depots | Tayuman Yard |
Lines served | Metro Commuter Line (2021–2024) Inter-Provincial Commuter (2022–) Bicol Commuter (2023–) |
Specifications | |
Car body construction | Stainless steel |
Train length | 103.5 m (339 ft 7 in) (5-car trainset with couplers) |
Car length | 20.7 m (67 ft 11 in) |
Width | 2.99 m (9 ft 10 in) |
Height | 3.53 m (11 ft 7 in) |
Floor height | 1.10 m (3 ft 7 in) |
Platform height | 1.10 m (3 ft 7 in) (MSC) Ground-height platforms (Inter-Provincial) |
Entry | Level (MSC) Step (IPC) |
Doors | 3 double-leaf doors per side; interior-sliding type |
Wheelbase | 2,200 mm (87 in) |
HVAC | ICOND roof-mounted air-conditioning |
Bogies | Bolsterless type |
Coupling system | AAR/knuckle |
Seating | Longitudinal |
Track gauge | 1,067 mm (3 ft 6 in) |
Notes/references | |
[1][2] |
The Philippine National Railways received a budget through the 2018 General Appropriations Act for the purchase of trains.[3] On May 28, 2018, three INKA CC300 locomotives and fifteen passenger coaches were ordered together with four sets of four-car trains worth ₱2.5 billion (US$47.4 million).[4][5][6]
The INKA CC300 locomotives and INKA 8300 coaches were delivered on December 23, 2020, and were unveiled on the same day.[7] Passenger trial runs begun on January 15, 2021, for 150-hour RAMS validation tests,[8] while the trains were officially inaugurated on January 28, 2021, at Dela Rosa station together with the Philippine National Railways and the Department of Transportation officials. The trains officially entered revenue service on the same day.[1][2][9]
The trains once served the PNR Metro South Commuter line between Tutuban and Alabang and vice versa. These were subsequently assigned to Bicol Commuter services. As of August 2023, DHL 9002 and 3-car PC 8302 serve Naga–Ligao services, while DHL 9003 and PC 8303 serves the Naga–Sipocot route.
The trains were manufactured by the Indonesian firm Industri Kereta Api, also known as INKA. The design were based on the middle coaches of the PNR 8000 class and 8100 class DMUs retaining the same specifications. The 8300 class coaches, along with the 8000 and 8100 DMUs are all given the designation K3 while in Indonesia.
The coaches sport a livery of white as the body color, with black in its windows and orange stripes. The coaches also bear the Philippine National Railways and the Department of Transportation logos.
Each car has one roof-mounted air-conditioning units that has a cooling capacity of 36,000 kcal (150,000 kJ). In total, there are five air-conditioning units in a five-car train set.[10]
There are three double-leaf sliding doors per side and longitudinal seats are used. The interior design is the same as the middle cars of the 8000 and 8100 DMUs. The middle coach has a control room where the doors, lighting, and passenger announcements are controlled.[1] Each car has closed-circuit television cameras installed.[9]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.