![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/b/b9/MetroDepot.jpg/640px-MetroDepot.jpg&w=640&q=50)
Line 1 (Navi Mumbai Metro)
Metro line in Navi Mumbai, India / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Panchanand metro station?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. When fully completed, the 23.40 km fully-elevated line will consist of 20 metro stations from Belapur to Khandeshwar.
Quick Facts Navi Mumbai Metro Line 1, Overview ...
Navi Mumbai Metro Line 1 | |||
---|---|---|---|
![]() Metro Depot in Taloja | |||
Overview | |||
Status |
| ||
Owner | CIDCO | ||
Line number | 1 | ||
Locale | Navi Mumbai, Maharashtra, India | ||
Termini |
| ||
Stations | 20 | ||
Service | |||
Type | Rapid transit | ||
System | Navi Mumbai Metro | ||
Operator(s) | Mahametro | ||
Depot(s) | Taloja | ||
Rolling stock | CRRC Zhuzhou Locomotive | ||
History | |||
Commenced | 28 October 2011 (2011-10-28) | ||
Opened | 17 November 2023 (2023-11-17) | ||
Technical | |||
Line length | 23.4 km (14.5 mi) | ||
Number of tracks | 2 | ||
Character | Elevated | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 25 kV 50 Hz AC overhead catenary | ||
Operating speed | 32[1] km/h (20 mph) | ||
|
Close
Construction on the line began in 2011 and was originally scheduled to open in 2016, but faced several delays. An 11.1 km (6.9 mi) section from Belapur to Pendhar with 11 stations, The Phase 1 of the line was inaugurated on 17 November 2023.