Top Qs
Timeline
Chat
Perspective

Beccles railway station

Railway station in Suffolk, England From Wikipedia, the free encyclopedia

Beccles railway stationmap
Remove ads

Beccles railway station is a stop on the East Suffolk Line in the east of England, serving the town of Beccles, Suffolk. It is 40 miles 34 chains (65.1 km) down the line from Ipswich and 109 miles 11 chains (175.6 km) from London Liverpool Street; it is situated between Brampton and Oulton Broad South stations. Its three-letter station code is BCC and is managed by Greater Anglia, which also operates all trains that call.

Quick facts General information, Location ...
Remove ads

History

Summarize
Perspective
Thumb
Beccles railway station in 1963
Thumb
View southward, towards Ipswich

The East Suffolk Railway opened in 1854, operating as far as Halesworth. The line was then extended to Ipswich and Yarmouth South Town in 1859; the Beccles to Lowestoft line opened in the same year. The Waveney Valley Line from Tivetshall on the Great Eastern Main Line reached Beccles in 1863, making the town an important junction on the expanding Great Eastern Railway network.

The Waveney Valley Line closed to passengers in 1954 and the Yarmouth-Beccles Line closed to passengers in 1959. The Waveney Valley Line was then closed to freight traffic in 1963. The engine shed was demolished in 2006.

Passing loop development

Work began in early 2010 to develop a passing loop at Beccles to allow services to operate hourly on the single-track line. The lack of a double-track to allow trains to pass north of Saxmundham had previously made this frequency of service impossible.

By March 2010, the single track at Beccles was renewed with continuously welded rail and concrete sleepers. The track was also realigned from the southern approach to the station to allow room for the loop. The old track was lifted and placed alongside the disused platform and disposed of in late 2010. By March 2012, work had started to build the passing loop and, by May of that year, new turnout points were in place and work had begun on redeveloping the disused island platform. The old trackbed had also been removed.

Work was completed by December 2012 and enhanced services began on 10 December 2012.[3] The £4 million scheme was jointly funded by Network Rail and Suffolk County Council.

Remove ads

Facilities

There is a café in the original station building adjoining the Lowestoft-bound platform.

There is a footbridge with quite steep ramps connecting the platforms and passenger information screens on both platforms.[4]

Services

As of December 2024, the typical Monday-Sunday off-peak service at Beccles is as follows:

More information Operator, Route ...

One weekday early-morning train is extended through to Harwich International and there is a return from there in the evening.[5]

More information Preceding station, National Rail ...

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads