Breagh gas field
UK natural gas field From Wikipedia, the free encyclopedia
Remove ads
The Breagh gas field is a natural gas reservoir and production facility in the UK sector of the southern North Sea. It is about 100 km of east of Teesside and started gas production in 2013.
Remove ads
The field
The Breagh field extends over UK offshore Blocks 42/13a and 42/12a. The field was discovered in July 1997 by well 42/13-2.[1] The reservoir is a Lower Carboniferous Sandstone formation and has reserves of 600 billion cubic feet.[1]
The Breagh gas field is jointly owned by INEOS (70%) and Sterling Resources (30%), INEOS operates the infrastructure.[1] RWE Dea was the original 70% owner and operator but this interest was transferred to INEOS in 2015.[1]
Remove ads
Development
Summarize
Perspective
Production from the field is developed in stages. In the first stage gas is produced by wells on the offshore platform Breagh Alpha and then via pipeline to the Teesside Gas Processing Plant at Seal Sands.[2] Later stages will entail development of the eastern part of the field produced back to a new Breagh Bravo platform.[1]
Details of the Breagh A field infrastructure are as shown.[1][2][3][4]
Platform name | Breagh |
Installation type | Fixed Steel platform |
Coordinates | 54°42’21”N 00°26’09”E |
Function | Integrated minimum facilities wellhead and production |
Crew | Not permanently attended |
Platform installed | October 2011 |
First gas | October 2013 |
Water depth, metres | 62 |
Design and Construction | Heeremaa Vlissingen, Netherlands |
Jacket weight, tonnes | 2,300 |
Topsides dimensions, metres | |
Topsides weight, tonnes | 1,200 |
No. of legs | 4 (8 piles) |
No. of well slots | 12 |
No. of Wells | 8 |
Gas processing capacity | 6.4 million cubic metres (225 million cubic feet) per day |
Production to | Teesside Gas Processing Plant |
Pipeline length and diameter | 100 km, 20-inch |
Pipeline Number | PL2768.1 PL2768.2 |
Methanol import | From shore by pipeline |
Pipeline length and diameter | 100 km, 3-inch |
Pipeline Number | PL2769.1 PL2769.2 |
The export pipeline from Breagh runs 100 km to shore at Coatham Sands. From here a 10 km onshore pipeline carries gas to the Teesside Gas Processing Plant (TGPP).[1]
The entry specification for 3rd party gas into the export pipeline is:[5]
In addition to the Breagh offshore facilities a new gas process facility was constructed at Seal Sands, the Teesside Gas Processing Plant which received and treated the gas prior to shipment into the National Transmission System.[1]
Remove ads
Production
Gas production from the Breagh field was as follows. in million standard cubic feet (MMSCF).[6]
![]() | This graph was using the legacy Graph extension, which is no longer supported. It needs to be converted to the new Chart extension. |
Data for 2021 is for January to October inclusive.
See also
References