Top Qs
Timeline
Chat
Perspective

Carillon hydroelectric generating station

Dam on the Ottawa River in Canada From Wikipedia, the free encyclopedia

Carillon hydroelectric generating stationmap
Remove ads

The Carillon generating station (in French: centrale de Carillon) is a hydroelectric power station on the Ottawa River near Carillon, Quebec, Canada. Built between 1959 and 1964, it is managed and operated by Hydro-Québec. It is a run-of-river generating station with an installed capacity of 752 megawatts (1,008,000 hp), a head of 17.99 meters (59.0 ft), and a reservoir of 26 square kilometers (10 sq mi).[1] The dam spans the river between Carillon and Pointe-Fortune, Quebec.

Quick Facts Official name, Location ...
Remove ads

Upon completion, the dam raised the water level by over 62 feet (19 m) at Carillon and over 9 feet (2.7 m) at Grenville. This inundated the rapids of Long-Sault on the Ottawa River, transforming them into calm (deeper) water. The dam also includes a modern lock that facilitates traffic on the Ottawa River, superseding the Carillon Canal.[2][3]

Thumb
View from Ontario side
Remove ads

See also

References

Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads